34
NT UF 841 CP GB (d) / June 2015
2) Screw probes
1
st
step: Check the position of the bosses relative to the drawing provided by Ultraflux
2
nd
step: Check the state of the seal face which must be free of irregularities and dirt. Seal faces which are
rusted, battered or generally in a bad state of repair must not be used.
3
rd
step: Insert the probe into the boss making sure the seal is present.
4
th
step: Screw the probe down into the boss as far as it will go, then readjust so that the alignment marker
of the probe is on the axis of its twin probe.
5
th
step: Carry out the previous steps from step no. 2 with the twin probe.
6
th
step: Connect the probes to the flow meter via the connection head or the push/pull connector
(depending on the type of probe).
7
th
step: Readjust the alignment of the probes checking the gain displayed by the flow meter.
3) Probes with air lock
1
st
step: Check the position of the bosses relative to the drawing provided by Ultraflux
2
nd
step: Check the state of the seal face which must be free of irregularities and dirt. Seal faces which are
rusted, battered or generally in a bad state of repair must not be used.
3
rd
step: Install the valve checking the presence of the seal. Screw the air lock onto the valve - at all times
checking the presence of the seal.
4
th
step: Press the operating rod down as far as it will go then screw the guide into the air lock.
5
th
step: Orientate the packing gland in the axis of the twin probe.
6
th
step: Carry out the previous steps from step no. 2 with the twin probe.
7
th
step: Connect the probes to the flow meter via the connecting head.
8
th
step: Readjust the alignment of the probes checking the gain displayed by the flow meter.
Содержание Uf 841
Страница 4: ...4 NT UF 841 CP GB d June 2015 CHAPTER 1 OVERVIEW...
Страница 12: ...12 NT UF 841 CP GB d June 2015 CHAPTER 2 SAFETY INSTRUCTIONS...
Страница 17: ...17 NT UF 841 CP GB d June 2015 CHAPTER 3 INSTALLATION AND WIRING...
Страница 25: ...25 NT UF 841 CP GB d June 2015 CHAPTER 4 INSTALLING A MEASURING POINT...
Страница 27: ...27 NT UF 841 CP GB d June 2015...
Страница 35: ...35 NT UF 841 CP GB d June 2015 CHAPTER 5 USING AND CONFIGURING THE Uf 841...
Страница 64: ...64 NT UF 841 CP GB d June 2015 CHAPTER 6 FUNCTION ENGINE...
Страница 68: ...68 NT UF 841 CP GB d June 2015 CHAPTER 7 PC SOFTWARE...
Страница 82: ...82 NT UF 841 CP GB d June 2015 Appendix I Characteristic echo signals...
Страница 85: ...85 NT UF 841 CP GB d June 2015 Appendix II Speed of sound in water...