![Ulma ENKOFORM VMK Скачать руководство пользователя страница 31](http://html1.mh-extra.com/html/ulma/enkoform-vmk/enkoform-vmk_user-manual_3336527031.webp)
ENKOFORM VMK
Construcción
31
ENKOFORM VMK
4.3.
TIE ROD PLACING
The TIE RODS used in ENKOFORM VMK are mainly
TIE RODS 15.
2 PANELS with TIE RODS 15 and PLATE WASHER NUTS 15.
TIE RODS 15 will always be placed through the gap
between the two UPN profiles of the MK-120
WALERS and they are tied up by NUT WASHER
PLATES 15.
Between the PANELS of both sides, a SPACER TUBE
22 will be introduced, with CONES 22 on both sides.
Detail of the joint of two face-to-face-PANELS with SPACER TUBES
22 and CONES 22 between them.
In case of liquid-hold-back, WATER STOP CAPS 26
will be used instead of CONES 22. The SPACER TUBE
22/26 will be placed between the 2 WATER STOP
CAPS 26. The PLUG 26 will be introduced in the
WATER STOP CAP 26 to avoid water leak.
This system lasts a liquid limit pressure of a 10 m
height.
Detail of the joint of two face-to-face-PANELS with SPACER TUBES
22/26 and WATER STOP CAPS.
Tie rod 15
Tie rod 15
Plate washer nut 15
Waler MK-120
Spacer tube 22/25 or 22/26
Plate washer nut 15
Waler MK-120
Spacer tube 22/26
Cone 22
Water stop
cap 26
The maximum working load of TIE RODS 15 is
90 kN.
Содержание ENKOFORM VMK
Страница 1: ...INDICE INDICE User s Guide ENKOFORM VMK E02FFR Construcci n...
Страница 4: ...NDICE Construcci n 4 INDICE...