Instructions for use (rev 251121)
e.ON sinter base
UGIN DENTAIRE
10
5.
START-UP
After checking that the mains voltage matches that noted on the rating plate, plug the cord into a standard
20A socket
with a ground terminal.
NOTE: If not used for a long time, switch off the power supply.
a)
Activate the breaker (ON/OFF) of furnace.
b)
Following power up, the initialization interface appears
on the screen. The main screen automatically appears
as follows:
menu “Working interface”.
c)
Open the door of the heating chamber.
Remove the protections and dust with a vacuum cleaner or a soft and clean brush (do not use
compressed air).
DO NOT PLACE ANY OBJECT INSIDE THE CHAMBER
(only tray for sinterizing and cover, sole and insulating plate)
IMPORTANT
▪
For the first time or after a long time without use, need to
preheat the muffle furnace
1 hour
at 120°C follow 2 hours at 300°C
to eliminate condensation and avoid fractures of the refractory
material.
▪
Carry out a decontamination program as a precautionary measure before the first use of the
furnace
: start the pre-recorded program number 40
(see chapter 5.6.1).
Содержание e.on sinter base
Страница 1: ...INSTRUCTIONS FOR USE Sintering furnace R v 251121...
Страница 4: ...Instructions for use rev 251121 e ON sinter base UGIN DENTAIRE 3 B WIRING DIAGRAM...
Страница 24: ......