
18
Operation
printed: 03/2012 Subject to change!
<
RTUserManual.doc
5 Operation
Following you find explanantions regarding all important position and function components for the
operation of the unit:
5.1 Operation elements
All operation elements are located at the front panel.
5.1.1 Comissioning
Please note the following checklist while commissioning your Infrared Rotisserie:
·
Firing order is allways from top to bottom.
·
To ignite, quarter-turn the knob C to the left (Max. position).
·
Then push the knob C to allow the gas to escape.
·
Use a suitable lighter.(eg. Ubert special gas lighter P/N GAZ).
·
After succesfull ignition, keep the knob pushed for 15-20 seconds.
·
After releasing the knob, the burner is in maximum position.
·
Turn the knob counterclockwise to change to minimum position.
5.1.2 Rotation of spits
Turn knob B to position I to start the gear motor. Turn knob B to position O to stop the gear motor.
5.1.3 Lighting (optional)
Turn knob A to position I to switch on lighting. Turn knob A to position O to switch off lighting.
5.1.4 Shut down
Turn knob C to position O to extinguish the burner.
5.1.5 For longer down times
For longer down times, all burners have to be extinguished and the main gas supply
valve has to be locked.
C
A
B
Содержание RT Series
Страница 1: ...User Manual Infrared Rotisserie RT Series...
Страница 2: ......
Страница 27: ...Maintenance 27 printed 03 2012 Subject to change RTUserManual doc 6 4 Declaration of Conformity...