Initial Installation Procedure 

15 

printed: 03/2012  Subject to change! 

 

<

 RTUserManual.doc 

4.3  Installation 

Before the unit can be installed it is necessary to have the comments / approvement 
of the responsible gas supply company. 
Only a installation company which is approved by the responsible gas supply compa-
ny is allowed to set up the unit, install the gas connection and to start the operation. 
The laws, technical regulations and directions mentioned under section 4.2.3 have to 
be observed. Only approved companies are allowed to do maintenance work or gas 
adjustments and they have to observe this manual and corresponding regulations. 

 

4.3.1  Statutory orders, technical regulations and directives 

The following regulations have to be observed when the unit is set up: 
 

  local statutory orders 

  local laws valid for your countries 

  technical regulations for fluid gas 

  directions of the local gas supply company 

 

Furthermore regulations of accident prevention valid for your country have to be ob-
served. 

For operating the unit outside Germany the national laws, technical regulations and 
directions of the specific country are valid.

 

 

4.3.2  Gas connection 

Check whether the gas unit is adjusted for the existing kind of gas. Compare the indi-
cated kind of gas on the type plate with the existing kind of gas. If this is not the case 
an adjustment according to the local requirements is necessary. The gas connection 
depends on the rotisserie model (external thread right acc. to DIN-ISO 7/1 [DIN 2999, 
part 1] 1 inch). The connection with the gas supply has to be made through the inter-
mediary of a connection armature and through a thermically secured shutoff device. 
Technical regulations have to be observed. Only an approved technician is allowed to 
do this work. After the gas connection has been made all points of connection have to 
be tested for leaks under operation pressure by leak detecting spray or by brushing 
with foam forming mediums which do not cause corrosion. 

 

4.3.3  Electrical connection 

Note!

 Note that also after installation and electrical connection the plug must be ac-

cessible. If this is not possible due to structural reasons, or if the unit is connected 
permanently, the power supply needs to have an interlock switch. 

 

 

Note!

 During any servicing, take care that the unit is disconnected from the mains! 

Not paying attention may result in injury! 

 

Please learn the electrical and technical data of your unit from the nameplate. 

·

  The unit is ready for plug-in. 

·

  For power supply a shockproof socket is necessary. 

·

  Make sure the supply cable is protected separatly with 16 Amps. 

The existing connection cable for the electrical connection is positioned at the lower 

 

Содержание RT Series

Страница 1: ...User Manual Infrared Rotisserie RT Series...

Страница 2: ......

Страница 3: ...2 5 Special safety notes for the user 6 3 Product information 8 3 1 Introduction 8 3 2 Special Features 8 3 3 Technical Data 9 4 Initial Installation Procedure 14 4 1 Unpacking 14 4 2 Installation 14...

Страница 4: ...nce hereby confirm the following That they know about the basic safety instructions and do know the regulations how to prevent possible accidents That they have read the safety chapter and warnings in...

Страница 5: ...regular maintenance of any parts being subject to wear and tear In case of nonprofessional service In case of any force majeure 2 3 Explaination of Symbols and notes for the user Within this operatio...

Страница 6: ...teps These operating instructions shoud be kept always together with the appliance Supplementing to the operation instructions within this manual all local regulations for accident prevention and for...

Страница 7: ...ng and repairing is performed Make sure that all loose screw connections are fixed and secured again Check all safety devices and their proper function carefully at the end of all mainte nance service...

Страница 8: ...ce available and where a reliable large capacity is required Built with a compact design the Infrared Rotisserie allows a capacity of up to 90 chicken or equivalent food products within 2 m A user fri...

Страница 9: ...00mm RT3G 3 1280mm 700mm 700mm 876mm 100mm RT33G 5 1280mm 700mm 700mm 876mm 100mm RT4G 4 1280mm 700mm 865mm 1041mm 100mm RT44G 7 1280mm 700mm 865mm 1041mm 100mm RT5G 5 1280mm 700mm 1030mm 1206mm 100mm...

Страница 10: ...0Hz 0 03kW RT5G R 25kW 230V 1 N 50Hz 0 03kW RT55G R 25kW 230V 1 N 50Hz 0 03kW RT6G R 30kW 230V 1 N 50Hz 0 03kW RT66G R 30kW 230V 1 N 50Hz 0 03kW RT7G R 35kW 230V 1 N 50Hz 0 03kW RT77G R 35kW 230V 1 N...

Страница 11: ...190 open fixed 2 5 RT4 44G 20 14 3 Propane 4 95 95 fixed 2 5 RT4 44G 20 14 3 Natural H 4 165 open fixed 2 5 RT4 44G 20 14 3 Natural L 4 190 open fixed 2 5 RT5 55G 25 17 9 Propane 5 95 95 fixed 2 5 RT5...

Страница 12: ...22G Propane 0 78 RT2 22G Natural H 1 06 RT2 22G Natural L 1 23 RT3 33G Propane 1 17 RT3 33G Natural H 1 59 RT3 33G Natural L 1 85 RT4 44G Propane 1 56 RT4 44G Natural H 2 12 RT4 44G Natural L 2 46 RT5...

Страница 13: ...3 3 7 The units correspond to kind of construction B11 The type plate is fixed on the front side of the unit and bears the following indications Serial number type Order number kind of construction ac...

Страница 14: ...r things which could block the slots Take care that the area around the rotisserie is free in order to load unload clean the unit or that maintenance works can be done smoothly The unit has to be set...

Страница 15: ...i cated kind of gas on the type plate with the existing kind of gas If this is not the case an adjustment according to the local requirements is necessary The gas connection depends on the rotisserie...

Страница 16: ...ting kind of gas If you adjust the unit for other gas types please check the indication of the nozzles The nominal heat load re sults from using the right nozzle with connection pressure of 20 mbar wi...

Страница 17: ...front of the unit 4 5 1 Replacement of main nozzle Close the main gas supply and unplug the unit Remove reflector sheet to get access to the tie rod at the back of the burner Unlock tie rod Remove bur...

Страница 18: ...gas to escape Use a suitable lighter eg Ubert special gas lighter P N GAZ After succesfull ignition keep the knob pushed for 15 20 seconds After releasing the knob the burner is in maximum position Tu...

Страница 19: ...ens nicht unkontrolliert hin und her bewegen Stecken Sie das H hnchen mit der Kopfseite voran auf den Grillspie F hren Sie den Vierkant stab des Spie es dabei durch das Loch an der Kopfseite in das H...

Страница 20: ...auf den Grillspie und verfah ren Sie weiter wie oben beschrieben Stecken Sie die Fl gelenden dann in das Loch am Fu ende des vorherigen H hnchens fest Fixieren Sie die H hnchenreihe mit der Endklammer...

Страница 21: ...3 2012 Subject to change RTUserManual doc 5 2 2 Use of baskets Legen Sie die H hnchen auf das Unterteil des Grillkorbes Stecken Sie das Oberteil des Grillkor bes auf das Unterteil und befestigen Sie d...

Страница 22: ...s It is absolutely necessary to watch out for some fundamental things to keep this longliving high grade steel machine working always keep the high grade steel surface clean watch out that there is al...

Страница 23: ...lasdoors optional Remove all remaining spits and or baskets Empty the drip tray Put a suitable container below the discharge valve Open the discharge valve Discharge all liquid into the container and...

Страница 24: ...24 Maintenance printed 03 2012 Subject to change RTUserManual doc 6 2 Wiring Diagram 6 2 1 All Models 240V 50 60Hz 1 N...

Страница 25: ...es will cause a loss of any warranty claims Also all certificates such as CE UL VDE GS and others will not be valid anymore 6 3 1 List of Spare Parts lamp socket 340412 halogen lamp 200W 340620 temper...

Страница 26: ...switch 16A 341115 dial scale I O 360203 shockproof plug 341301 plug for motor female 341401 plug for motor male 341302 burner 190583 ceramic inlay large 350805 ceramic inlay small 350806 wire mesh 190...

Страница 27: ...Maintenance 27 printed 03 2012 Subject to change RTUserManual doc 6 4 Declaration of Conformity...

Отзывы: