Initial Installation Procedure 

printed: 03/2012  Subject to change! 

 

<

 RTUserManual.doc 

4  Initial Installation Procedure 

Our Infrared Rotisseries are packed for safe transport, so that they can reach their 
destination without any damages. However we advise an examination of Infrared 
Rotisseries right after delivery. 

Attention! 

Do report visible damages immediately! 

 

4.1  Unpacking 

  Open the box and take out the wrapping and filling material carefully. 

  Take out all single parts and check whether these are complete (compare with enclosed dis-

patch documents). 

  Now please remove the cardboard packaging and all wrapping and covering folios from the ro-

tisserie. 

4.2  Installation 

Install the unit and set it up at the desired place. Make sure that the unit is visible to 
your customers to create a demand for your food offer and increase your sales. 

During installation please note the following: 

  Install the feet of the unit and set it up at the place as wanted. 

  Set up the unit on an even, horizontal surface! Line up the unit horizontal. 

  Observe that all slots for air supply and ventilation are held free and are at least 

100 mm away from walls or similar things which could block the slots. 

  Take care that the area around the rotisserie is free in order to load, unload, clean 

the unit or that maintenance works can be done smoothly. 

  The unit has to be set up in a way that the surrounding area can be cleaned. 

 

4.2.1  Place of operation 

Important!

 The rotisserie has to be set up on an even, stable and fireproof surface in 

a good ventilated room and below an existing ventilation hood. Depending on the 
model the unit can be placed free in a room or at a temperature-resistant wall or in 
one line with other equipment. A minimum distance of 200 mm from walls made of 
inflammable material has to be observed. If these distances fall below corresponding 
heat protection measures have to be made, for instance tiling of walls or application of 
a radiation protection. Before you install the unit check the type plate, whether the unit 
is approved for the the local existing kind of gas. If the kind of gas indicated on the 
type plate does not agree with the required kind of gas, the installation of the rotis-
serie is not allowed until the unit has been adjusted according to the requirements. 

 

 

Note!

 When installed in a sales vehicle, make sure that the provided converter cre-

ates a sinusoidal rotating field. 

 

 

Note!

 It is not allowed to set up a workplace in the area of radiation heating as it is 

too hot there. 

 

 

Содержание RT Series

Страница 1: ...User Manual Infrared Rotisserie RT Series...

Страница 2: ......

Страница 3: ...2 5 Special safety notes for the user 6 3 Product information 8 3 1 Introduction 8 3 2 Special Features 8 3 3 Technical Data 9 4 Initial Installation Procedure 14 4 1 Unpacking 14 4 2 Installation 14...

Страница 4: ...nce hereby confirm the following That they know about the basic safety instructions and do know the regulations how to prevent possible accidents That they have read the safety chapter and warnings in...

Страница 5: ...regular maintenance of any parts being subject to wear and tear In case of nonprofessional service In case of any force majeure 2 3 Explaination of Symbols and notes for the user Within this operatio...

Страница 6: ...teps These operating instructions shoud be kept always together with the appliance Supplementing to the operation instructions within this manual all local regulations for accident prevention and for...

Страница 7: ...ng and repairing is performed Make sure that all loose screw connections are fixed and secured again Check all safety devices and their proper function carefully at the end of all mainte nance service...

Страница 8: ...ce available and where a reliable large capacity is required Built with a compact design the Infrared Rotisserie allows a capacity of up to 90 chicken or equivalent food products within 2 m A user fri...

Страница 9: ...00mm RT3G 3 1280mm 700mm 700mm 876mm 100mm RT33G 5 1280mm 700mm 700mm 876mm 100mm RT4G 4 1280mm 700mm 865mm 1041mm 100mm RT44G 7 1280mm 700mm 865mm 1041mm 100mm RT5G 5 1280mm 700mm 1030mm 1206mm 100mm...

Страница 10: ...0Hz 0 03kW RT5G R 25kW 230V 1 N 50Hz 0 03kW RT55G R 25kW 230V 1 N 50Hz 0 03kW RT6G R 30kW 230V 1 N 50Hz 0 03kW RT66G R 30kW 230V 1 N 50Hz 0 03kW RT7G R 35kW 230V 1 N 50Hz 0 03kW RT77G R 35kW 230V 1 N...

Страница 11: ...190 open fixed 2 5 RT4 44G 20 14 3 Propane 4 95 95 fixed 2 5 RT4 44G 20 14 3 Natural H 4 165 open fixed 2 5 RT4 44G 20 14 3 Natural L 4 190 open fixed 2 5 RT5 55G 25 17 9 Propane 5 95 95 fixed 2 5 RT5...

Страница 12: ...22G Propane 0 78 RT2 22G Natural H 1 06 RT2 22G Natural L 1 23 RT3 33G Propane 1 17 RT3 33G Natural H 1 59 RT3 33G Natural L 1 85 RT4 44G Propane 1 56 RT4 44G Natural H 2 12 RT4 44G Natural L 2 46 RT5...

Страница 13: ...3 3 7 The units correspond to kind of construction B11 The type plate is fixed on the front side of the unit and bears the following indications Serial number type Order number kind of construction ac...

Страница 14: ...r things which could block the slots Take care that the area around the rotisserie is free in order to load unload clean the unit or that maintenance works can be done smoothly The unit has to be set...

Страница 15: ...i cated kind of gas on the type plate with the existing kind of gas If this is not the case an adjustment according to the local requirements is necessary The gas connection depends on the rotisserie...

Страница 16: ...ting kind of gas If you adjust the unit for other gas types please check the indication of the nozzles The nominal heat load re sults from using the right nozzle with connection pressure of 20 mbar wi...

Страница 17: ...front of the unit 4 5 1 Replacement of main nozzle Close the main gas supply and unplug the unit Remove reflector sheet to get access to the tie rod at the back of the burner Unlock tie rod Remove bur...

Страница 18: ...gas to escape Use a suitable lighter eg Ubert special gas lighter P N GAZ After succesfull ignition keep the knob pushed for 15 20 seconds After releasing the knob the burner is in maximum position Tu...

Страница 19: ...ens nicht unkontrolliert hin und her bewegen Stecken Sie das H hnchen mit der Kopfseite voran auf den Grillspie F hren Sie den Vierkant stab des Spie es dabei durch das Loch an der Kopfseite in das H...

Страница 20: ...auf den Grillspie und verfah ren Sie weiter wie oben beschrieben Stecken Sie die Fl gelenden dann in das Loch am Fu ende des vorherigen H hnchens fest Fixieren Sie die H hnchenreihe mit der Endklammer...

Страница 21: ...3 2012 Subject to change RTUserManual doc 5 2 2 Use of baskets Legen Sie die H hnchen auf das Unterteil des Grillkorbes Stecken Sie das Oberteil des Grillkor bes auf das Unterteil und befestigen Sie d...

Страница 22: ...s It is absolutely necessary to watch out for some fundamental things to keep this longliving high grade steel machine working always keep the high grade steel surface clean watch out that there is al...

Страница 23: ...lasdoors optional Remove all remaining spits and or baskets Empty the drip tray Put a suitable container below the discharge valve Open the discharge valve Discharge all liquid into the container and...

Страница 24: ...24 Maintenance printed 03 2012 Subject to change RTUserManual doc 6 2 Wiring Diagram 6 2 1 All Models 240V 50 60Hz 1 N...

Страница 25: ...es will cause a loss of any warranty claims Also all certificates such as CE UL VDE GS and others will not be valid anymore 6 3 1 List of Spare Parts lamp socket 340412 halogen lamp 200W 340620 temper...

Страница 26: ...switch 16A 341115 dial scale I O 360203 shockproof plug 341301 plug for motor female 341401 plug for motor male 341302 burner 190583 ceramic inlay large 350805 ceramic inlay small 350806 wire mesh 190...

Страница 27: ...Maintenance 27 printed 03 2012 Subject to change RTUserManual doc 6 4 Declaration of Conformity...

Отзывы: