Page 14
Initial Installation Procedure
printed: 06/2020 Subject to change!
:FFUserManual.docx
4 Initial Installation Procedure
Our Wall of Flame Rotisseries are packed for safe transport, so that they can reach their
destination without any damages. However, we advise an examination of the Wall of
Flame Rotisserie right after delivery.
Attention!
Do report visible damages immediately!
4.1 Unpacking
•
Open the box and take out the wrapping and filling material carefully.
•
Take out all single parts and check whether these are complete (compare with enclosed dispatch
documents).
•
Now please remove the cardboard packaging and all wrapping and covering folios from the rotis-
serie.
4.2 Installation
4.2.1 General information
•
Install the feet of the unit and set it up at the place as wanted.
•
Set up the unit on an even, horizontal surface! Line up the unit horizontal.
•
Observe that all slots for air supply and ventilation are held free and are at least 100
mm away from walls or similar things which could block the slots.
•
Take care that the area around the rotisserie is free in order to load, unload, clean the
unit or that maintenance works can be done smoothly.
•
The unit has to be set up in a way that the surrounding area can be cleaned.
4.2.2 Place of operation
Attention!
The device must be placed on a level, solid and fireproof surface in an well
ventilated room under an on-site extraction hood. Depending on the type, the device
can be placed freely, on a temperature-resistant wall or with other devices in a row. A
minimum distance of 100mm from the sidewalls, the rear wall and walls mad of possibly
combustible material must be met. When these distances are too narrow, you have to
take heat conversation measures, e.g. tiling the walls or affixing of a radiation protection.
Before you connect the device, you have to check the type plate, whether the device is
approved for the used gas type. If the kind of gas indicated on the type plate does not
agree with the required kind of gas, the installation of the device is not allowed until the
unit has been adjusted according to the requirements
4.2.3 Statutory orders, technical regulations and directions
The following regulations have to be observed when the unit is set up:
•
local statutory orders
•
local laws valid for your countries
•
technical regulations for LPG
•
directions of the local gas supply company
Furthermore, regulations of accident prevention valid for your country have to be ob-
served.
For operating the unit outside Germany, the national laws, technical regulations and di-
rections of the specific country are valid.
Содержание FF Series
Страница 1: ...User Manual Wall of Flame FF Series...
Страница 2: ......
Страница 31: ...Maintenance 31 printed 06 2020 Subject to change FFUserManual docx 6 9 Declaration of Conformity...