8
THE BOILER IS TOP-HEAVY. Do not
allow it to tip over.
1.
Remove the sleeve.
2.
Remove the contents from the skid, except
the boiler.
3.
Remove the four (4) hex-drive lag screws
holding the boiler to the skid (Figure 1-a).
DO NOT DAMAGE front air dam. It is
required for proper operation of the boiler.
1. UNPACk ThE CRATE
4.
Tip the boiler and shimmy it off the skid
(Figure 1-b).
1-a