Gas piping to the boiler must be sized to deliver adequate gas for the boiler to fire at the nameplate input at an inlet
pressure between the minimum and maximum values shown in Table 8.2. When sizing, also consider other existing
and expected future gas utilization equipment (i.e. water heater, cooking equipment). For more information on gas line
sizing, consult the utility or the
National Fuel Gas Code,
NFPA 54/ANSI Z223.1, and/or CAN/CSA B149.1
Natural
Gas and Propane Installation Code.
Figure 8.1 shows typical gas piping connection to the boiler. A sediment trap must be installed upstream of all gas
controls. Install the factory provided manual shut-off valve outside the jacket with a ground joint union as shown.
All above ground gas piping upstream from manual shut-off valve must be electrically continuous and bonded to a
grounding electrode. Refer to
National Electrical Code,
NFPA 70.
The boiler and its gas connection must be leak tested before placing the boiler in operation. When doing this, the boiler
and its individual shut-off must be disconnected from the rest of the system during any pressure testing of that system
at pressures in excess of 1/2 psi (3.5kPa). When pressure testing the gas system at pressures of 1/2 psi (3.5kPa) or
less, isolate the boiler from the gas supply system by closing its individual manual shut-off valve. Locate leaks using
appropriate combustible gas non-corrosive leak detector solution.
VIII. Gas Piping
WARNING
Explosion Hazard. Failure to properly pipe gas supply to boiler may result in improper operation or
leaks of flammable gas.
Gas supply to boiler and system must be absolutely shut off prior to installing or servicing boiler gas
piping.
Always assure gas piping is absolutely leak free and of the proper size and type for the connected
load.
Use a thread compound compatible with liquefied petroleum gas. Failure to use proper thread
compounds on all gas connectors may result in leaks of flammable gas.
If inlet pressure is above 1/2 psig (3.5 kPa) an additional gas pressure regulator is required. Consult
gas supplier.
Size corrugated stainless steel tubing (CSST) to ensure proper capacity and minimize flow
restrictions.
DANGER
Explosion Hazard. Do not use matches, candles, open flames or other ignition source to check for leaks.
WARNING
If gas pressure in the building is above ½ psig (3.5 kPa), an additional gas pressure regulator is required.
Using one additional regulator for multiple gas appliances may result in unsafe boiler operation. The
additional regulator must be able to properly regulate gas pressure at the input of the smallest appliance.
If the regulator can not do this, two or more additional regulators are required. Consult regulator
manufacturer and/or local gas supplier for instructions and equipment ratings.
Содержание ASPEN ASPN-320
Страница 11: ...11 107750 01 9 17 IV Locating the Boiler continued Figure 4 1 Minimum Clearances To Combustible Construction ...
Страница 13: ...13 107750 01 9 17 Figure 5 1 Wall Layout Mounting Hole Location V Mounting The Boiler continued ...
Страница 88: ...88 107750 01 9 17 Figure 10 4 Proper Installation of Header Sensor X Wiring continued ...
Страница 89: ...89 107750 01 9 17 Figure 10 5 Internal Wiring Ladder Diagram X Wiring continued ...
Страница 90: ...90 107750 01 9 17 X Wiring continued CONDENSATE FLOAT SWITCH ...
Страница 91: ...91 107750 01 9 17 X Wiring continued Figure 10 6 Internal Wiring Connections Diagram ...
Страница 100: ...100 107750 01 9 17 Operating Instructions XI Start Up and Checkout continued ...
Страница 145: ...145 107750 01 9 17 XV Service Parts continued ...
Страница 147: ...147 107750 01 9 17 XV Service Parts continued All Models ...
Страница 149: ...149 107750 01 9 17 XV Service Parts continued All Models ...
Страница 151: ...151 107750 01 9 17 XV Service Parts continued All models ...
Страница 157: ...157 107750 01 9 17 ...
Страница 158: ...158 107750 01 9 17 ...
Страница 159: ...159 107750 01 9 17 ...
Страница 160: ...160 107750 01 9 17 U S Boiler Company Inc P O Box 3020 Lancaster PA 17604 1 888 432 8887 www usboiler net ...