9
107750-01 - 9/17
Table 2.4: Vent Lengths
Model
Size
Nominal
Vent/Intake Size
(in)
Min Vent Length
(in)
Max Vent
Length (ft)
Approx.
Derate at Max Vent
(%)
320
3
30
60
8.2
4
30
135
3.7
399
3
30
50
5.3
4
30
135
2.9
See Section VII “Venting” for additional requirements and details.
1. Safe, reliable operation of this boiler depends upon installation by a professional heating contractor in strict accordance
with this manual and the requirements of the authority having jurisdiction.
• In the absence of an authority having jurisdiction, installation must be in accordance with this manual
and the National Fuel Gas Code, ANSI Z223.1. In Canada, installation must be in accordance with the B149.1
Installation Code.
• Where required by the authority having jurisdiction, this installation must conform to the
Standard for Controls
and Safety Devices for Automatically Fired Boilers
(ANSI/ASME CSD-1).
2. Read Section VII “Venting” to verify that the maximum combustion air and exhaust pipe lengths will not be exceeded
in the planned installation. Also verify that the vent terminal can be located in accordance with Section VII “Venting”.
3. Make sure that the boiler is correctly sized:
• For heating systems employing convection radiation (baseboard or radiators), use an industry accepted sizing
method such as the
I=B=R
Guide RHH published by the Air-Conditioning, Heating and Refrigeration Institute
(AHRI).
• For new radiant heating systems, refer to the radiant tubing manufacturer’s boiler sizing guidelines.
• For system which includes an indirect water heater, make sure the boiler has the output called for by the indirect
water heater manufacturer’s instructions.
4. All boilers are shipped from the factory configured for 0 - 2,000 ft. altitude. For high altitude installation above 2,000
ft., see Appendix A.
5. All boilers are shipped from the factory configured for use with natural gas. They may be converted for use with
LP gas (“propane”) using proper conversion kit per Table 3.1. Use a combustion analyzer and follow all instructions
supplied with conversion kit.
III. Before Installing
II. Specifications
(continued)
Size
LP Conversion Kit
320
108015-01
399
108015-02
Table 3.1 LP Conversion Kits
Содержание ASPEN ASPN-320
Страница 11: ...11 107750 01 9 17 IV Locating the Boiler continued Figure 4 1 Minimum Clearances To Combustible Construction ...
Страница 13: ...13 107750 01 9 17 Figure 5 1 Wall Layout Mounting Hole Location V Mounting The Boiler continued ...
Страница 88: ...88 107750 01 9 17 Figure 10 4 Proper Installation of Header Sensor X Wiring continued ...
Страница 89: ...89 107750 01 9 17 Figure 10 5 Internal Wiring Ladder Diagram X Wiring continued ...
Страница 90: ...90 107750 01 9 17 X Wiring continued CONDENSATE FLOAT SWITCH ...
Страница 91: ...91 107750 01 9 17 X Wiring continued Figure 10 6 Internal Wiring Connections Diagram ...
Страница 100: ...100 107750 01 9 17 Operating Instructions XI Start Up and Checkout continued ...
Страница 145: ...145 107750 01 9 17 XV Service Parts continued ...
Страница 147: ...147 107750 01 9 17 XV Service Parts continued All Models ...
Страница 149: ...149 107750 01 9 17 XV Service Parts continued All Models ...
Страница 151: ...151 107750 01 9 17 XV Service Parts continued All models ...
Страница 157: ...157 107750 01 9 17 ...
Страница 158: ...158 107750 01 9 17 ...
Страница 159: ...159 107750 01 9 17 ...
Страница 160: ...160 107750 01 9 17 U S Boiler Company Inc P O Box 3020 Lancaster PA 17604 1 888 432 8887 www usboiler net ...