134
107750-01 - 9/17
i.
Unplug the igniter, ground, and flame sensor wires
from the ignition electrode and the flame sensor (Figure 13.2).
j.
Use an 8mm wrench to remove
blower from fire door (Figure 13.2).
k.
Use a 10 mm wrench to remove
fire door to the heat exchanger (Figure 13.2). Carefully remove the door from
the heat exchanger, being careful not to damage the refractory insulation on the inside of the door (see Refractory
Warning on page 130) or the electrodes.
l.
Inspect fire door insulation
for deterioration or damage. Replace if necessary.
m.
Inspect the heat exchanger combustion chamber and vacuum
any debris found. If necessary, combustion
chamber may be brushed with a nonabrasive, nonmetallic brush. Do not use cleaning agents, solvents, acid or alkali
products of any type to clean the heat exchanger .
n.
Inspect the burner for heat damage
or other deterioration. Use compressed air to clean off dust or debris from
ports.
o.
Inspect igniter electrode and flame sensor
for deposits. Clean any found with steel wool. Do not use sand paper
or Emory cloth for this cleaning. Inspect the ceramic portion of both of these parts for cracks and replace if any are
found. Verify that the igniter gap is within the range shown in Figure 13.3.
p.
Inspect the blower and gas valve
, looking for dust, lint, or other debris that may have been drawn into this
assembly. Excessive deposits may be vacuumed out.
Inspect all rubber and plastic components on the blower and gas valve, looking for deterioration. Replace
blower and/or gas valve if deterioration is found.
q.
Inspect and clean the condensate trap
. Inspect condensate trap to verify it is open and free from debris. If needed,
remove trap from heat exchanger and hanging bracket. Flush any debris found in the trap with water – do not use
other cleaning agents. Reassemble the trap as shown in Figure 13.4.
XIII. Service and Maintenance
(continued)
WARNING
Asphyxiation Hazard. Do not operate the boiler without the float switch in place. Doing so could result
in flue gas leakage into the indoors resulting in personal injury or death from Carbon Monoxide (CO)
poisoning.
NOTICE
Attempting to clean the heat exchanger or trap with anything other than water could result in condensate
backup, causing the boiler to shut-down.
CAUTION
Do not over tighten fire door mounting nuts. Doing so could break the fire door mounting studs. If any of
these studs are damaged, the heat exchanger must be replaced. Use of a short 10 mm box wrench will
reduce the risk of damaging these studs.
r.
Reinstall the fire door, blower, and gas valve assembly
, following the above steps in reverse order.
s.
Inspect the vent system to verify that
:
• All gaskets and joints between the boiler heat exchanger and terminal are leak tight.
• All supports are intact and vent system is properly pitched
• All pipe is in good condition. Look for damage such as cracks, heat distortion, discoloration, and embrittlement.
If any such damage is found, the pipe must be replaced and the cause of the damage identified and corrected.
• Vent/Intake terminals are in good condition, free from blockages, and still correctly located relative to doors,
windows,
decks,
etc.
• There is no gasoline, flammable liquids/vapors, or halogen based products stored in the vicinity of the
vent or inlet terminals. Also verify that there are no chemical products containing chlorine, chloride based salts,
chlorofluorocarbons, paint removers, cleaning solvents, or detergents stored near the air intake terminal.
Содержание ASPEN ASPN-320
Страница 11: ...11 107750 01 9 17 IV Locating the Boiler continued Figure 4 1 Minimum Clearances To Combustible Construction ...
Страница 13: ...13 107750 01 9 17 Figure 5 1 Wall Layout Mounting Hole Location V Mounting The Boiler continued ...
Страница 88: ...88 107750 01 9 17 Figure 10 4 Proper Installation of Header Sensor X Wiring continued ...
Страница 89: ...89 107750 01 9 17 Figure 10 5 Internal Wiring Ladder Diagram X Wiring continued ...
Страница 90: ...90 107750 01 9 17 X Wiring continued CONDENSATE FLOAT SWITCH ...
Страница 91: ...91 107750 01 9 17 X Wiring continued Figure 10 6 Internal Wiring Connections Diagram ...
Страница 100: ...100 107750 01 9 17 Operating Instructions XI Start Up and Checkout continued ...
Страница 145: ...145 107750 01 9 17 XV Service Parts continued ...
Страница 147: ...147 107750 01 9 17 XV Service Parts continued All Models ...
Страница 149: ...149 107750 01 9 17 XV Service Parts continued All Models ...
Страница 151: ...151 107750 01 9 17 XV Service Parts continued All models ...
Страница 157: ...157 107750 01 9 17 ...
Страница 158: ...158 107750 01 9 17 ...
Страница 159: ...159 107750 01 9 17 ...
Страница 160: ...160 107750 01 9 17 U S Boiler Company Inc P O Box 3020 Lancaster PA 17604 1 888 432 8887 www usboiler net ...