
87
107362-01 - 8/17
Figure 9.9b: Piping Method #2: Direct Connection of Boiler to Heating Top and Boiler to Indirect Water Heater
Bottom
IX. System Piping
(continued)
Relief Valve
Flow Check
(Can be incorporated
with System Circulator)
System
Circulator
Y-Strainer
(Recommended)
Balancing
Valve
From
Convection
System
To
Convection
System
Air Separator
& Air Vent
Fill Valve
Backflow
Preventer
Cold Water Line
Expansion Tank
Secondary Unions
(Not Required; Optional
Location Shown)
Temperature/Pressure Gauge
Drain Valve
Indirect
Circulator
Flow
Check
Indirect Domestic
Water Heater (IWH)
Full Port Isolation Valves
Indirect
Supply
Indirect
Return
Full Port
Isolation Valves
Содержание ASPEN ASPN-085
Страница 13: ...13 107362 01 8 17 Figure 5 1 Wall Layout Mounting Hole Location V Mounting The Boiler continued...
Страница 94: ...94 107362 01 8 17 Figure 10 5 Internal Wiring Ladder Diagram X Wiring continued...
Страница 95: ...95 107362 01 8 17 PAGE LEFT INTENTIONALLY BLANK...
Страница 96: ...96 107362 01 8 17 X Wiring continued CONDENSATE FLOAT SWITCH...
Страница 97: ...97 107362 01 8 17 X Wiring continued Figure 10 6 Internal Wiring Connections Diagram...
Страница 106: ...106 107362 01 8 17 Operating Instructions XI Start Up and Checkout continued...
Страница 156: ...156 107362 01 8 17 XV Service Parts continued 3J 3I 3E 3B 3A 3C 3F 3H 3G 3D 3A 3C 3D 3K 3E All Models...
Страница 158: ...158 107362 01 8 17 4F 4F 4F 4F 4G 4G 4B 4A 4C 4E 4D 4B 4B 4B XV Service Parts continued All Models...
Страница 160: ...160 107362 01 8 17 XV Service Parts continued All models 5G 5F 5B 5A 5D 5E 5C 5D...
Страница 179: ...179 107362 01 8 17...
Страница 180: ...180 107362 01 8 17 U S Boiler Company Inc P O Box 3020 Lancaster PA 17604 1 888 432 8887 www usboiler net...