
126
107362-01 - 8/17
Example Pump Parameter selections (continued):
XII. Operation
F. Changing Adjustable Parameters (continued)
Single Boiler with Supply Piped IWH, System and DHW Wired to Master
C
B
B
A
Flow Check
Optional
Full Port
Isolation
Valves
Heating
Circulators
Optional
Full Port
Isolation
Valves
To
System
Expansion Tank
Air Separator
& Air Vent
Close Nipple
(Locate Header Sensor
As Close As Possible
To Downstream Tee)
Hydraulic Separator
May Be Substituted
For Tees
Header Temperature
Sensor
(When Used)
Fill
Valve
Backflow
Preventer
Cold
Water
Line
Y-Strainer
(Recommended)
From
System
Full Port
Isolation
Valves
Indirect
Circulator
Relief Valve
Drain Valve
Secondary Unions Not
Required; Optional
Locations Shown
Full Port
Isolation
Valves
Flow Check
Indirect
Supply
Indirect
Return
Indirect Domestic
Water Heater
(IWH)
At least eight pipe diameters upstream of first tee.
A.
No further apart than 12" (~30 cm) or four pipe diameters, whichever is smaller.
B.
At least 18" (~46 cm) of straight pipe for Conventional Air Scoop.
C.
Boiler Circulator
To
System
Heating
System
Circulator
System
Zone
Valves
Optional Zone Valve
Controlled System
1
CAUTION:
It is the installers responsibility
to select boiler piping configurations that provide
the proper flow rates and performance for the boiler
and indirect water heater.
Parameter Selections:
System Pump = “Central Heat,
Optional Priority”
Boiler Pump = “any demand”
DHW Pump = “Primary Loop Piped IWH”
DHW Priority Enable is optional
Explanation:
When call for Domestic Hot Water is received
the DHW pump is turned on and the boiler
pump is turned on. This piping arrangement
permits the system pump to run or not run
when there is a domestic hot water call for
heat. Domestic hot water priority is optional.
It is permissible for the domestic and system
pumps to run at the same time. The boiler
pump must run for every call for heat.
Parameter Selections:
System Pump = "Central Heat Optional
Priority"
Boiler Pump = "CH, OFF for DHW"
DHW Pump = "Boiler Piped IWH"
Explanation:
Ensure boiler and DHW pump are sized
to maintain flow through boiler within limits
shown in Table 9.3. Only DHW pump runs
during DHW demand. Only Boiler and
System pumps run during CH, Auxiliary
Heat, and Frost Protection demands.
When there is CH demand and DHW
demand has remained on longer than
Priority Time, DHW pump is forced off and
Boiler and System pump will start.
CAUTION:
It is the installers responsibility
to select boiler piping configurations that provide
the proper flow rates and performance for the boiler
and indirect water heater.
Single Boiler with Supply Piped IWH, Heating Top/Indirect Bottom Connection
C
B
A
Flow Check
Optional Full
Port Isolation Valve
Heating Circulator
Optional Full
Port Isolation Valve
To
System
Expansion Tank
Air Separator
& Air Vent
Fill Valve
Backflow Preventer
Cold Water Line
Header Temperature Sensor
(When Used)
Indirect
Supply
Indirect
Return
Indirect Domestic
Water Heater (IWH)
Close Nipple
(Locate Header Sensor
as close as possible to
downstream tee)
From
System
A. At least eight pipe diameters upstream of first tee.
B. No further apart than 12" (~30cm) or four pipe diameters, whichever is smaller.
C. At least 18" (~46cm) of straight pipe for Conventional Air Scoop.
Y-Strainer
(Recommended)
Hydraulic Separator
may be substituted
for tees
Flow Check
Indirect Circulator
Full Port Isolation Valves
Drain Valves
Boiler
Circulator
Flow Check
Full Port Isolation Valves
Relief Vavle
Secondary Unions
(Not Required; Optional
Location Shown)
Optional Zone Valve
Controlled System
Heating
System
Circulator
System
Zone
Valve
To
System
Содержание ASPEN ASPN-085
Страница 13: ...13 107362 01 8 17 Figure 5 1 Wall Layout Mounting Hole Location V Mounting The Boiler continued...
Страница 94: ...94 107362 01 8 17 Figure 10 5 Internal Wiring Ladder Diagram X Wiring continued...
Страница 95: ...95 107362 01 8 17 PAGE LEFT INTENTIONALLY BLANK...
Страница 96: ...96 107362 01 8 17 X Wiring continued CONDENSATE FLOAT SWITCH...
Страница 97: ...97 107362 01 8 17 X Wiring continued Figure 10 6 Internal Wiring Connections Diagram...
Страница 106: ...106 107362 01 8 17 Operating Instructions XI Start Up and Checkout continued...
Страница 156: ...156 107362 01 8 17 XV Service Parts continued 3J 3I 3E 3B 3A 3C 3F 3H 3G 3D 3A 3C 3D 3K 3E All Models...
Страница 158: ...158 107362 01 8 17 4F 4F 4F 4F 4G 4G 4B 4A 4C 4E 4D 4B 4B 4B XV Service Parts continued All Models...
Страница 160: ...160 107362 01 8 17 XV Service Parts continued All models 5G 5F 5B 5A 5D 5E 5C 5D...
Страница 179: ...179 107362 01 8 17...
Страница 180: ...180 107362 01 8 17 U S Boiler Company Inc P O Box 3020 Lancaster PA 17604 1 888 432 8887 www usboiler net...