
40
107362-01 - 8/17
Option #
35
36
37
38
39
Illustrated in Figure
7.23, 7.24
7.23, 7.24
7.23, 7.24
7.23, 7.24
7.23, 7.24
Pipe Penetration
Through Structure
Vent
Roof
Roof
Roof
Roof
Roof
Intake
Wall
Wall
Wall
Wall
Wall
Material
Vent
Selkirk
Polyflue (Rigid/
Flex)
Selkirk
Polyflue (Rigid/
Flex)
Centrotherm
InnoFlue
(Rigid/Flex)
Centrotherm
InnoFlue
(Rigid/Flex)
DuraVent
FasNSeal
Flex
Intake
PVC
PVC
PVC
PVC
Stainless
Steel
Nominal Diameter
Vent
2"
3"
2"
3"
3"
Intake
2" or 3"
3"
2" or 3"
3"
3"
2" or 3"Min Equivalent Vent Length:
Model Sizes
85
30"
30"
30"
30"
30"
110
30"
30"
30"
30"
30"
155
Not Permitted
30"
Not Permitted
30"
30"
205
30"
30"
30"
270
30"
30"
30"
Max Equivalent Vent Length (Note 1):
Model Sizes
85
60ft
135ft
60ft
135ft
135ft
110
60ft
135ft
60ft
135ft
135ft
155
Not Permitted
135ft
Not Permitted
135ft
135ft
205
135ft
135ft
135ft
270
135ft
135ft
135ft
Rigid Vent Terminals
Vent
Not Permitted
Intake
Flex Termination
& Components
(Masonry Chimney
Chase) (Note 3)
Vent
2PF-FLEX-KIT
2PF-FLEX
3PF-FLEX-KIT
3PF-FLEX
IFCK02**
IFCK03**
3FS Flex-**
FS Flex RC3
Intake
90 elbow w/
screen
90 elbow w/
screen
90 elbow w/
screen
90 elbow w/
screen
90 elbow w/
screen
Flex Termination &
Components (B-Vent
Chimney Chase)
Vent
2PF-10UV or
2PF-39UV w/
Screen 2PF-
BVSC
3PF-10UV OR
3PF-39UV w/
Screen 3PF-
BVSC (Note 4)
IFBK02****
IFBK03****
Not Permitted
Intake
90 elbow w/
screen
90 elbow w/
screen
90 elbow w/
screen
90 elbow w/
screen
VII. Venting
D. Design Requirements Unique to Split Vent Systems (continued)
* Specify size of B vent (e.g. 2PPS-BV
6
is for use with 6" B vent).
** Specify length in feet.
**** Specify Flex length and B vent diameter (e.g. IFBK02
2505
includes 25ft of flex and used with 5" B vent).
Note 1: Max vent lengths shown also apply to the intake. Flex vent reduces the maximum allowable vent length. See equivalent
lengths for flex vent shown in Figure 7.14 and sizing example on page 32.
Note 2: At least 30" of CPVC pipe, and at least one CPVC elbow, must be installed between the boiler's vent connection and
PVC pipe.
Note 3: If masonry chimney contains flues in addition to that being used for chase,
ALL
must be unused.
Note 4: See vent manufacturer's installation manual for gaskets, spacers and other required vent components.
All vertical terminals require compatible roof flashing and storm collars.
Содержание ASPEN ASPN-085
Страница 13: ...13 107362 01 8 17 Figure 5 1 Wall Layout Mounting Hole Location V Mounting The Boiler continued...
Страница 94: ...94 107362 01 8 17 Figure 10 5 Internal Wiring Ladder Diagram X Wiring continued...
Страница 95: ...95 107362 01 8 17 PAGE LEFT INTENTIONALLY BLANK...
Страница 96: ...96 107362 01 8 17 X Wiring continued CONDENSATE FLOAT SWITCH...
Страница 97: ...97 107362 01 8 17 X Wiring continued Figure 10 6 Internal Wiring Connections Diagram...
Страница 106: ...106 107362 01 8 17 Operating Instructions XI Start Up and Checkout continued...
Страница 156: ...156 107362 01 8 17 XV Service Parts continued 3J 3I 3E 3B 3A 3C 3F 3H 3G 3D 3A 3C 3D 3K 3E All Models...
Страница 158: ...158 107362 01 8 17 4F 4F 4F 4F 4G 4G 4B 4A 4C 4E 4D 4B 4B 4B XV Service Parts continued All Models...
Страница 160: ...160 107362 01 8 17 XV Service Parts continued All models 5G 5F 5B 5A 5D 5E 5C 5D...
Страница 179: ...179 107362 01 8 17...
Страница 180: ...180 107362 01 8 17 U S Boiler Company Inc P O Box 3020 Lancaster PA 17604 1 888 432 8887 www usboiler net...