VII. Venting
E. Assembly of CPVC/PVC Vent Systems (continued)
Figure 7.26: Vent Connections and Flue Gas Sample Cap Location
h. Maintain the clearances from the vent pipe outlined in Part VII-A of this manual. If exiting the exterior wall using PVC
pipe, use half of an appropriately sized wall thimble (or a sheet metal plate) on the exterior of the building, to provide a
weather tight seal while maintaining the proper clearance in the wall penetration. Seal the joint between the pipe and the
wall plate using RTV applied on the exterior side of the wall. This sealant must not restrain the expansion of the vent pipe.
2. Installation of Air Intake System - Start assembly of the PVC air intake system at the boiler. Assembly of the air intake
system is done in the same manner as the vent system except as follows:
a. Drill a 7/32" clearance hole into the front side of the air intake adapter. Insert the first piece of PVC air intake pipe
into the air intake connection and drill a 1/8" tap hole into the PVC which lines up with the 7/32" clearance hole and
secure them together with a #10 x 1" sheet metal screw. Seal the joint between the intake pipe and the adaptor with
RTV.
b. All intake piping may be PVC.
c. There is a 0" minimum clearance between the air intake piping and all types of construction.
d. To the extent possible, pitch horizontal air intake piping towards the outdoors.
3. Installation of Horizontal Fitting Terminals (Terminal Option A):
a. See Figure 7.27 for proper orientation of twin pipe horizontal terminals. Outer edge of both terminals must be within 10"
from wall surface. (Figure 7.6)
b. If desired, the terminals can be attached to the end of the vent and/or intake pipes with field supplied stainless steel screws
so that they can be later removed for cleaning and inspection. If this is done, drill a clearance hole in the coupling or
elbow and a tap hole in the end of the vent/intake pipes to accept these screws.
c. If these terminals are installed on snorkels, assemble the snorkels as shown in Figure 7.12. Brace the vertical run of
piping on the building exterior as required.
Содержание ASPEN ASPN-085
Страница 13: ...13 107362 01 8 17 Figure 5 1 Wall Layout Mounting Hole Location V Mounting The Boiler continued...
Страница 94: ...94 107362 01 8 17 Figure 10 5 Internal Wiring Ladder Diagram X Wiring continued...
Страница 95: ...95 107362 01 8 17 PAGE LEFT INTENTIONALLY BLANK...
Страница 96: ...96 107362 01 8 17 X Wiring continued CONDENSATE FLOAT SWITCH...
Страница 97: ...97 107362 01 8 17 X Wiring continued Figure 10 6 Internal Wiring Connections Diagram...
Страница 106: ...106 107362 01 8 17 Operating Instructions XI Start Up and Checkout continued...
Страница 156: ...156 107362 01 8 17 XV Service Parts continued 3J 3I 3E 3B 3A 3C 3F 3H 3G 3D 3A 3C 3D 3K 3E All Models...
Страница 158: ...158 107362 01 8 17 4F 4F 4F 4F 4G 4G 4B 4A 4C 4E 4D 4B 4B 4B XV Service Parts continued All Models...
Страница 160: ...160 107362 01 8 17 XV Service Parts continued All models 5G 5F 5B 5A 5D 5E 5C 5D...
Страница 179: ...179 107362 01 8 17...
Страница 180: ...180 107362 01 8 17 U S Boiler Company Inc P O Box 3020 Lancaster PA 17604 1 888 432 8887 www usboiler net...