TYROLIT Hydrostress FGE 250 Скачать руководство пользователя страница 9

4 Troubleshooting

EN Floor grinding machine FGE 250

9

4 Troubleshooting

Only suitably knowledgeable, qualified profes­

sional technicians may perform repairs on the

machine.

Malfunction

Cause

Rectification

Machine will not start.

Connecting cable for the voltage sup­

ply is not properly connected with the

power socket.

Plug power plug [16, Fig. D] into the

socket.

Connecting cable is defective.

Replace connecting cable.

Safety switch is defective.

Replace safety switch.

Grinding pattern is uneven.

ETX diamond tools are loose.

Fasten ETX diamond tools.

ETX diamond tools are damaged or

worn.

Replace ETX diamond tools.

5 Maintenance

Observe the safety instructions in Chapter 2!

The operating and maintenance personnel resp­

onsible for the machine must ensure that no one

can enter the machine’s danger zone during

operation or maintenance work!
Maintenance work may only be performed by

trained specialists! They must be familiar with

the dangers associated with such work, protect

themselves and avoid danger!
When working on the machine (set-up, mainte­

nance, service, repair, cleaning, etc.), the power

supply of the machine has to be disconnected

from the mains

(disconnect power plug)!
Perform cleaning and maintenance work in ac­

cordance with the operating manual and check

the safety equipment for completeness and

functionality.

5.1 Customer service and spare parts

In case of customer service queries, replacement

parts or repairs, please contact the manufacturer. To

ensure your queries are dealt with as quickly as pos­

sible, always quote your machine data. These are

located on the machine’s nameplate.

5.2 Mounting and dismantling ETX diamond

tools

The consistency of the surface to be ground de­

termines type or the composition of the ETX diamond

tools to be used.
1.

Pull the power plug [16, Fig. D] from the line to

the voltage supply.

2.

Remove assembly tool [20, Fig. D] from the ma­

chine console [9].

3.

Place the machine with the handle [1, Fig. A] on

the floor (

!

Fig. K).

4.

With the machine tipped, the grinding

plate [22, Fig. E] is accessible with the ETX

diamond tools [23, Fig. E].
The ETX diamond tools need to be checked for

wear and damage by the user before each use

and be replaced by new ones if necessary.

5.

Use the assembly tool to loosen the three clam­

ping screws [24, Fig. E] of the retaining ring.

6.

Turn retaining ring [25, Fig. F] counter-clock­

wise to full stop. (

!

arrow)

The three recesses [27, Fig. F] have to be posi­

tioned each at one ETX diamond tool.

7.

Loosen the ETX diamond tool [23, Fig. G] from

the grinding plate with a gentle strike of a lump

hammer and remove it. (

!

arrow)

8.

Remove all ETX diamond tools.

9.

Insert new ETX diamond tool [23, Fig. G] into

the recess [27, Fig. F] of the grinding plate and

press in firmly in the direction of the arrow (use

lump hammer if necessary).

10. Mount all ETX diamond tools.
11. Turn retaining ring [25, Fig. H] clockwise to full

stop. (

!

arrow)

Содержание FGE 250

Страница 1: ...1 10999135_en EN Floor grinding machine FGE 250 Translation of the original operating instructions 4...

Страница 2: ...2 Fig A 1 2 3 11 4 9 Fig B 5 6 12 7 10 8 12 Fig C 7 14 13 4 5 11 Fig D 9 21 19 15 18 11 20 7 16 15 17 3 Fig E 22 7 25 23 24 26 24 25 27 23 Fig F...

Страница 3: ...3 Fig J 23 Fig G 24 27 23 Fig H 25 Fig J Fig K 26 14 28 Fig L 7 7 26 14 14 Fig M 12 4...

Страница 4: ...7 B C E L Cover 8 B C D Holder 9 B D Machine console 10 B M Carriage height adjustment 11 B C D Transport wheel 12 B Clamping screw for drive 13 C Transport grip 14 C K L Safety hood Pos Fig Designati...

Страница 5: ...ss AG All rights including those pertaining to translation lie with TYROLIT Hydrostress AG No part of this documentation may be reproduced used or distributed in any form without the written permissio...

Страница 6: ...must be checked for com pleteness and function before start up The safety equipment must be in place during operation The surfaces to be ground by the machine must be free of obstacles Risk of injury...

Страница 7: ...y protruding objects 2 Loosen the clamping screw 15 Fig D adjust the guide bar 3 Fig D to the appropriate work position and retighten the clamping screw 3 Check ETX diamond tools for function and con...

Страница 8: ...are to be ground wet 12 Hold the machine by the handle 1 Fig A of the guide bar 13 Press the safety switch 2 Fig A on one or both sides and hold tight The surface to be ground can now be machined Dep...

Страница 9: ...1 Customer service and spare parts In case of customer service queries replacement parts or repairs please contact the manufacturer To ensure your queries are dealt with as quickly as pos sible always...

Страница 10: ...the machine Observe the safety instructions in Chapter 2 The machine is delivered in a complete and packaged condition from the manufacturer 1 Unpack machine and check the enclosed delivery slip to ma...

Страница 11: ...quency 50 Hz Rated current 13 2 A Rated power 2 2 kW Tool speed 1400 min 1 Protection rating IP 23 Dimensions L x B x H about 1000 x 400x 1000 mm Working width 250 mm Grinding pressure 34 kg Weight 54...

Страница 12: ...TYROLIT Hydrostress AG Witzbergstrasse 18 CH 8330 Pf ffikon ZH Switzerland Telefon 41 0 44 952 18 18 Telefax 41 0 44 952 18 00 URL www tyrolit com...

Страница 13: ...6 Wasserwaage 6 7 Abdeckung 7 8 Halterung 8 9 Maschinenkonsole 9 10 Fahrwerk H henverstellung 10 11 Transportrad 11 12 Klemmschraube f r schwenkbaren Antrieb 12 13 Transportgriff 13 14 Saugglocke 14...

Страница 14: ...41 0 44 952 18 18 Telefax 41 0 44 952 18 00 URL www tyrolit com 25 Sicherungsring 25 26 Abstandshaube 26 27 Aussparung 27 Aussparung zum Werkzeugwechsel 28 Abstandblech 28 A Fig A B Fig B C Fig C D Fi...

Отзывы: