Wire and Harnessing Products
Engineering Specification
No:
ES 61402
Rev:
D
Date: July 9, 1991
Page: 7 of 16
If this document is printed it becomes uncontrolled. Check for the latest revision.
2. Preparation
For
Use
2.1 Power
Connection
Connect the Waffle Iron II to a grounded 50 or 60 Hz power source of the current capability
and voltage specified on the back of the heating tool.
2.2 Platen
Installation
Step
1
Select the correct platen set as called out in the product installation instructions.
Step
2
Before installation or after cleaning, spray or wipe platens with light coat of release agent,
such as Miller-Stephenson MS-122* or Axel MoldWiz**.
o
Coat only the side of the platen that comes into contact with the part being
terminated.
Step
3
Make sure that the power is turned off.
Step
4
Unlatch and open the upper heat sink by pushing it down and releasing it.
*Miller-Stephenson Chemical Co., Inc.
Danbury, Connecticut 06810
** Axel Plastics Research Laboratories, Inc.
41-14 27
th
. St., Long Island City, NY 11101
WARNING
When using release agent in pressurized containers,
Read and observe all manufacturer’s precautions, warnings,
and instructions