Wire and Harnessing Products
Engineering Specification
No:
ES 61402
Rev:
D
Date: July 9, 1991
Page: 13 of 16
If this document is printed it becomes uncontrolled. Check for the latest revision.
5. Set the TEMP dial to 0 and the TIME dial to 5.
6. Run two warm-up heating cycles.
o
Either open the upper heat sink or turn the POWER switch off and on to reset the
heating tool between heating cycles.
7. Perform the test cycle once for each TEMP/TIME setting in the table below. The test
cycle is as follows:
a. Set the TEMP/TIME controls to the appropriate numbers.
b. Simultaneously push the START button and start the stopwatch and temperature
recording device.
c. Monitor or record the temperature throughout the 10-second window starting at 25
seconds and ending at 35 seconds.
8. Compare the peak temperatures measured in the time window to the requirements in the
temperature table below. The maximum temperature reached during the 10-second
window must fall within the applicable range from the temperature table.
IMPORTANT: A numerical correction factor must normally be added to or subtracted from
the measured temperatures:
a. For early units, apply the correction factor located on the tag attached to the
CE-1406800 calibration platen.
b. For late model units, always apply the correction factor located above the
thermocouple connection on the back. (If using the CE-1406800 calibration platen
with late model units, disregard the correction factor on the tag.)
If the peak temperature readings fall outside the limits specified in the temperature table, the
heating tool should be removed from service, and the Raychem Field Service Representative
contacted to arrange for repair or recalibration.
TEMPERATURE TABLE
WAFFLE IRON II
CONTROL SETTING
TEMPERATURE REQUIREMENT, °F
(RANGE OF MAXIMUM TEMPERATURE TO BE
REACHED DURING 10-SECOND WINDOW
TEMP TIME
0
5
340 - 380
1
5
355 - 395
2
5
370 - 410