Wire and Harnessing Products
Engineering Specification
No:
ES 61402
Rev:
D
Date: July 9, 1991
Page: 10 of 16
If this document is printed it becomes uncontrolled. Check for the latest revision.
3.3 Termination
Procedure
WARNING
In keeping with good industrial hygienic practice, adequate ventilation must be
maintained whenever plastic materials are heated.
Step 1
Make sure that the set-up is completed (section 2), the tool is turned on and warmed up (para. 3.1),
and the TEMP and TIME controls are set (para. 3.2).
Step 2
Open the upper heat sink and the cable clamps.
Step 3
Load the assembly to be terminated onto the lower platen of the heating tool.
o
Position CTMs so that the top surface faces upward and the CTM is centered in the
platen.
o
Position MTC and SEM connector wafers against the stop in the platen, with the
contact numbers facing upward. The cable or wires should extend to the operator's
right.
o
Position round wires through the platen comb and close the clamp.
Step 4
Line up the edges of the cable (FCC) with the cable guide lines in the top surface of the heating
tool, and close the clamp(s) on the cable.
Step 5
Inspect to make sure that the cable or wires are fully inserted and properly positioned on top of the
solder terminals. Reposition cable or wires if necessary.
Step 6
Close and latch the upper heat sink.