
409–10052
SDE Electric Bench Terminator 1490076–2
Rev O
6 of 13
3. RECEIVING/INSPECTION AND INSTALLATION
3.1. Receiving/Inspection
The SDE Electric Bench Terminator 1490076–2 is thoroughly inspected during and after assembly. Prior to
packaging and shipping, a final series of tests and inspections is made to ensure proper functioning of the
terminator. The following inspection should be performed as a safeguard against potential problems generated
in transit.
The components of the terminator are packaged so that they can be removed from the packaging and immediately
installed, as described in Paragraph 3.2.
1. In a well–lighted area, carefully uncrate the terminator and inspect each component as it is removed
from the crate.
2. Thoroughly inspect each component for evidence of damage that may have occurred in transit. If any
of the components are damaged, file a claim against the carrier and notify Tyco Electronics
immediately.
3. Inspect all electrical lines for evidence of damage.
It is important that this manual and other documents (such as drawings and parts lists), as well as any enclosed
product samples, remain with the terminator for the benefit of personnel responsible for installation, operation,
and maintenance.
3.2. Installation
Place the SDE Electric Bench Terminator 1490076–2 on a well lit desktop. Plug the electrical cord into the
electrical outlet (refer to Figure 2 for power requirements, and Paragraph 4.4,A for instructions on plugging the
cord into the outlet).
If required, secure the terminator to the bench.
4. OPERATION
To avoid personal injury, do not cycle the SDE Electric Bench Terminator without the tool head installed.
4.1. Installation and Removal of SDE Tool Head 1673663–2
A. Installation
Before mounting the SDE tool head, always make sure that the guide ram of the terminator is in the lowest
position. (Refer to Figure 6.)
To avoid personal injury, be sure the SDE Electric Bench Terminator is disconnected from the power source prior to
the installation or removal of the tool head.
1. Be sure that the terminator has been switched off.
2. Be sure that the SDE tool head is mounted with opening for the dies in the front, to facilitate die
installation and removal.
3. Mount the head from the back and lock with the safety pins. (Refer to Figures 7 and 8.)
4. Refer to Paragraph 4.2, to remove and install the crimping dies.
B. Removal
To avoid personal injury, be sure the SDE Electric Bench Terminator is disconnected from the power source prior to
the installation or removal of the tool head.
1. Be sure the terminator has been switched “off.”
2. Remove the locating pins from the tool holder.
3. Remove and/or replace the tool head.
4. When removing the tool head, make sure that the guide ram of the terminator is in the lowest
position.
5. If installing or removing crimping dies, refer to Paragraph 4.2.
4.2. Installation of Crimping Dies
To avoid personal injury, be sure the SDE Electric Bench Terminator is disconnected from the power source prior to
the installation or removal of the crimping dies.
NOTE
NOTE
DANGER
DANGER
DANGER
DANGER