background image

E-2/3DB CONTROLLER 

 

E:\Documents and Settings\Administrator\Local Settings\Temporary Internet Files\OLK3\E2-3DB.doc 
Rev. 01/13/00; Rev. 07/2000 o2L/H 
Rev. 10/2000 (dwgs. 100239, 601, 601-01, 601-02, H02-258, 100031, 279L, 274S, 100089) 
Rev. 06/21/00 (Reformatted Text; Revised Pg. 3 (2.4.1, 20 amp to 30 amp)

 

Pg. 28 

6.0 

MAJOR COMPONENTS LIST (continued) 

 

SCHEMATIC TAG 

DESCRIPTION 

PART NUMBER 

T3A, T3B, T3C 

BURSTING CHOKE 

100273 

T4, T5, T6, T7, 
T8, T9 

TRIGGER TRANSFORMER 

STC05005 

TB1 

17 PART TERM BLK 

TERMBLK-17 

TB2 

7 PARK TERM BLK 

TERMBLK141-7 

TB3 

12 PART TERM BLK 

TERMBLK 141-12 

TB5 

3 PART TERM BLK 

CURBLK 

TLS1 

THERMAL LIMITING SWITCH/210 

STJ10008 

TLS2 

THERMAL LIMITING SWITCH/130 

STJ10010 

TB4 

4 PART TERM BLK 

TERMBLK141-4 

J2 

6 POSITION PLUG 

STT60017 

J3 

18 POSITION PLUG 

STT60015 

 

FLASHTUBE SOCKET 

100319 

 

HINGE GASKET 

STBEAGSKT 

 

LENS GASKET 

STBEAGSKT2 

 

CLEAR LENS 

STDBCLENS 

 

DB STROBE BEACON FIXTURE 

STDBEACON 

 

STROBE BEACON CABLE 

STROBCABLE-3 

 

SIDELIGHT CABLE 

STCABLEOB 

 

FAN PLUG 

CD045-36 

 

VENT FILTER 

STFILTER 

 
 

Содержание E-2/3DB

Страница 1: ...279L 274S 100089 Rev 06 21 00 Reformatted Text Revised Pg 3 2 4 1 20 amp to 30 amp IMPORTANT PLEASE TAKE THE TIME TO FILL OUT THIS FORM COMPLETELY FILE IT IN A SAFE PLACE IN THE EVENT YOU EXPERIENCE...

Страница 2: ...G KIT WIRING 5 2 6 ALARM WIRING 8 2 6 1 WHITE STROBE 1 FAILURE ST1 8 2 6 2 WHITE STROBE 2 FAILURE ST2 8 2 6 3 WHITE STROBE 3 FAILURE ST3 8 2 6 4 RED STROBE FAILURE RF 8 2 6 5 POWER FAILURE PF 9 2 6 6...

Страница 3: ...IMING 16 3 7 6 TIMING SIGNAL VERIFY 16 3 7 7 FLASH VERIFIED 16 3 7 8 STROBE FAIL TEST 17 4 0 TROUBLE SHOOTING 18 4 1 TOOL REQUIREMENTS 18 4 2 DIAGNOSTIC EVALUATION 18 4 3 TROUBLE SHOOTING ASSISTANCE 1...

Страница 4: ...AGRAM SCHEMATIC M01 279 HOUSING DETAIL HD0 279 INSTALLATION GUIDELINE INS 279 PHOTOCELL HOUSING DETAIL 100239 TOWER LIGHTING KIT 351 TO 500 601 TOWER LIGHTING KIT 351 TO 500 CONDUIT CABLE 601 01 TOWER...

Страница 5: ...visual hazard marking 1 1 APPLICATION The E 2 3DB Controller is for use on lighting structures or towers 351 to 700 AGL above ground level that are approved to be lighted with Dual White Red Flashing...

Страница 6: ...net can be located at the base of the structure or in an equipment building Mounting Dimensions can be found in Section 1 2 on page 5 Pay particular attention when choosing your controller mounting lo...

Страница 7: ...ell housing socket wiring is the same as above 2 3 1 Connect the BLACK wire from the photocell to terminal block TB2 5 2 3 2 Connect the RED wire from the photocell to terminal block TB2 6 2 3 3 Conne...

Страница 8: ...IFIED SERVICE PERSONNEL ONLY WHEN PERSONNEL IS INSTALLING SYSTEM OR PERFORMING MAINTENANCE ON THIS SYSTEM MAKE SURE THE POWER IS TURNED OFF AT THE SERVICE BREAKER PANEL READ AND UNDERSTAND THE THEORY...

Страница 9: ...n the controller to the beacon utilizing either strobe cable or conduit method Refer to Drawings HDO 279 601 601 01 and 601 02 for installation of light kits Following these minimum guidelines as well...

Страница 10: ...the 14 gauge White Green wire from Beacon 1 wiring to TB1 5 2 5 2 6 Connect the 10 gauge Red Black wire from Beacon 2 wiring to TB1 6 2 5 2 7 Connect the 10 gauge Red wire from Beacon 2 wiring to TB1...

Страница 11: ...located to the left of TB1 2 5 2 20 Connect the 16 gauge Bare Drain wire if strobe cable install from Beacon 2 to second ground lug located to the left of TB1 2 5 2 21 Connect the 16 gauge Bare Drain...

Страница 12: ...Alarm configurations are shown on Drawings H40 279 and M01 279 2 6 1 White Strobe 1 Failure ST1 Connect the customer s alarm common to plug J3 terminal 2 Connect the customer s alarm wire to plug J3...

Страница 13: ...inal 16 for on operation monitoring 2 6 7 Sidelight 1 Alarm SA1 Connect the customer s alarm common to Module M1 terminal T4 Connect the customer s alarm wire to Module M1 terminal T5 for normally ope...

Страница 14: ...t Reset the breaker to resume normal operation 2 7 4 Photocell PC Controller should be in the daymode of operation when performing this test Check status of operation Turn SW1 on or cover the photocel...

Страница 15: ...Connect at least an 18 20 gauge wire from PCB 1 connector P1 15 from unit set up to be the master unit to PCB 1 connector P1 15 of unit set up to be the slave unit 2 8 2 Connect at least an 18 20 gau...

Страница 16: ...orage capacitors C102 C112 and C122 through current limiting resistors R31A R31B and R31C and steering diodes D5 D6 and D8 for nightmode operation Resistors R31A R31B and R31C are bypassed through K5A...

Страница 17: ...de ionizes returning to its non conducting state until another trigger pulse arrives to repeat the process Meanwhile the storage capacitor is being re charged by the transformer and the high voltage...

Страница 18: ...con If any Red Strobe flashtube fails to flash for any reason the alarm circuit would operate relay K8 on PCB 3 that the customer can connect to their alarm transmitting devices The alarm point can be...

Страница 19: ...NDS AFTER POWER HAS BEEN TURNED OFF BEFORE STARTING ANY WORK ON THIS SYSTEM ALWAYS MEASURE THE VOLTAGE ON THE STORAGE CAPACITORS WITH A VOLTMETER BEFORE STARTING ANY OTHER WORK ON THIS SYSTEM NEVER AT...

Страница 20: ...onger present 3 7 4 Nightmode Output voltage from the photocell SSR is connected to the coil of relay K4 on PCB 3 Whenever the photocell senses the darkness or switch SW1 is on relay K4 will energize...

Страница 21: ...T2 T3 T4 T5 and T6 on PCB 1 T1 T2 T3 T4 T5 and T6 will send a pulse to the gate of the SCR s Q6 Q8 Q10 Q13 Q14 and Q17 and turns it on Capacitors C12 C13 C14 C15 C16 and C17 via Q6 Q8 Q10 Q13 Q13 Q14...

Страница 22: ...be required A recommendation list includes 1 5 16 Flat Electrician s Screwdriver 1 2 Phillips Screwdriver 1 Nut Driver or Socket Set 1 Multi meter Analog or Digital 600V AC 600V DC Minimum 4 2 DIAGNOS...

Страница 23: ...the status of trigger LED6 If LED is dim or off check fuse F41 If blown replace with exact type of fuse If the fuse blows again check transformer T1 Replace as necessary If LED is okay go to the next...

Страница 24: ...tem appears to be working normally or fails to show an alarm when there is an obvious failure check relay K8 coil for an open condition Normal resistance should be around 2K ohm If coil is open replac...

Страница 25: ...wdriver 5 1 FLASHTUBE REPLACEMENT The only required maintenance needed to be performed is the replacement of the flashtubes every four 4 years By following these instructions maximum safety and perfor...

Страница 26: ...d latch securely 5 1 15 Close the upper hinge assembly and latch securely 5 2 RED OBSTRUCTION LIGHTING The only required maintenance needed to be performed is replacement of the lamps in the L 810 fix...

Страница 27: ...nce intervals can vary due to location seasonal weather conditions and general housekeeping of site The filter is located on the inside of the enclosure on the lower right hand side Tools Required Non...

Страница 28: ...OLK3 E2 3DB doc Rev 01 13 00 Rev 07 2000 o2L H Rev 10 2000 dwgs 100239 601 601 01 601 02 H02 258 100031 279L 274S 100089 Rev 06 21 00 Reformatted Text Revised Pg 3 2 4 1 20 amp to 30 amp Pg 24 The ph...

Страница 29: ...C CAP STB99005 C101A 5UF 660V AC CAP STB99001 C102 C112 C122 4UF 2 5 KV CAP CSI STB99010 C103 C131 40 UF 1KV CAP STB99006 CSS CABINET SAFETY SWITCH STJ02001 FAN AXIAL FAN EP123815HBT F1 1 amp FUSE KTK...

Страница 30: ...rary Internet Files OLK3 E2 3DB doc Rev 01 13 00 Rev 07 2000 o2L H Rev 10 2000 dwgs 100239 601 601 01 601 02 H02 258 100031 279L 274S 100089 Rev 06 21 00 Reformatted Text Revised Pg 3 2 4 1 20 amp to...

Страница 31: ...MOV524V15 MOVMOD1 2 3 4 SURGE SUPPRESSOR DTK 120HW MOV 2 3 4 5 6 MOV 7 METAL OXIDE VARISTOR V1000LA80A P1 J1 15 POSITION PLUG STT60009 P2 12 POSITION PLUG STT60019 PCB 1 E 2 3DB CONTROL PCB STH01279 P...

Страница 32: ...CHOKE 100273 T4 T5 T6 T7 T8 T9 TRIGGER TRANSFORMER STC05005 TB1 17 PART TERM BLK TERMBLK 17 TB2 7 PARK TERM BLK TERMBLK141 7 TB3 12 PART TERM BLK TERMBLK 141 12 TB5 3 PART TERM BLK CURBLK TLS1 THERMAL...

Страница 33: ...0 dwgs 100239 601 601 01 601 02 H02 258 100031 279L 274S 100089 Rev 06 21 00 Reformatted Text Revised Pg 3 2 4 1 20 amp to 30 amp Pg 29 7 0 SUGGESTED SPARE PARTS LIST QUANTITY DESCRIPTION PART NUMBER...

Страница 34: ......

Страница 35: ......

Страница 36: ......

Страница 37: ......

Страница 38: ......

Страница 39: ......

Страница 40: ......

Страница 41: ......

Страница 42: ......

Страница 43: ......

Страница 44: ......

Страница 45: ......

Страница 46: ......

Страница 47: ......

Страница 48: ......

Страница 49: ......

Отзывы: