SAFETY AND INSTALLATION
TWECO 201TS
Manual 0-5150 3-7
Safety and Installation
4. Equipotential Bonding
Bonding of all metallic components in the welding installation and adjacent to it should be considered. However,
metallic components bonded to the work piece will increase the risk that the operator could receive a shock by
touching the metallic components and the electrode at the same time. The operator should be insulated from
all such bonded metallic components.
5. Earthing of the Work Piece
Where the work piece is not bonded to earth for electrical safety, nor connected to earth because of its size
and position, e.g. ship’s hull or building steelwork, a connection bonding the work piece to earth may reduce
emissions in some, but not all instances. Care should be taken to prevent the earthing of the work piece
increasing the risk of injury to users, or damage to other electrical equipment. Where necessary, the connection
of the work piece to earth should be made by direct connection to the work piece, but in some countries where
direct connection is not permitted, the bonding should be achieved by suitable capacitance, selected according
to national regulations.
6. Screening and Shielding
Selective screening and shielding of other cables and equipment in the surrounding area may alleviate problems
of interference. Screening the entire welding installation may be considered for special applications.
3.07 Volt-Ampere Curves
Voltage-Amperage Curves shows maximum voltage and amperage output capabilities of welding power source.
Curves of other settings fall between curves shown.
Art # A-10158
230VAC Input
0
10
20
30
40
50
60
70
80
0
50
100
150
200
250
AMPS
VOLTS
Stick Max
Lift TIG Max
Содержание ArcMaster 201 TS
Страница 6: ...TABLE OF CONTENTS This Page Intentionally Blank...
Страница 18: ...TWECO 201TS INTRODUCTION introduction 2 2 Manual 0 5150 This Page Intentionally Blank...
Страница 36: ...TWECO 201TS THEORY OF OPERATION Theory of Operation 5 2 Manual 0 5150 This Page Intentionally Blank...
Страница 48: ...TWECO 201TS TROUBLESHOOTING Troubleshooting 6 12 Manual 0 5150 Art A 09895_AB...
Страница 50: ...TWECO 201TS TROUBLESHOOTING Troubleshooting 6 14 Manual 0 5150 This Page Intentionally Blank...
Страница 53: ...DISASSEMBLY PROCEDURE TWECO 201TS Manual 0 5150 7 3 Disassembly Procedure 1 2 Art A 10166_AB 3 Art A 10167...
Страница 54: ...Disassembly Procedure 7 4 Manual 0 5150 TWECO 201TS DISASSEMBLY PROCEDURE 4 Art A 10168 5 6 Art A 10169...
Страница 58: ...Disassembly Procedure 7 8 Manual 0 5150 TWECO 201TS DISASSEMBLY PROCEDURE 3 Art A 10174 4 Art A 10175_AB...
Страница 60: ...Disassembly Procedure 7 10 Manual 0 5150 TWECO 201TS DISASSEMBLY PROCEDURE 3 4 Art A 10177 1 5 7 3 Art A 10178...
Страница 61: ...DISASSEMBLY PROCEDURE TWECO 201TS Manual 0 5150 7 11 Disassembly Procedure 6 2 Art A 10179...
Страница 65: ...Manual 0 5150 8 3 Assembly Procedures ASSEMBLY PROCEDURE TWECO 201TS 6 7 Art A 10183 8 Art A 09883...
Страница 67: ...Manual 0 5150 8 5 Assembly Procedures ASSEMBLY PROCEDURE TWECO 201TS Art A 12756 4 Art A 10269_AB 6 7 8 5...
Страница 69: ...Manual 0 5150 8 7 Assembly Procedures ASSEMBLY PROCEDURE TWECO 201TS 11 10 Art A 10188 12 Art A 10189...
Страница 71: ...Manual 0 5150 8 9 Assembly Procedures ASSEMBLY PROCEDURE TWECO 201TS 1 Art A 10160...
Страница 76: ...Replacement Parts 9 4 Manual 0 5150 TWECO 201TS REPLACEMENT PARTS This Page Intentionally Blank...
Страница 78: ...TWECO 201TS ACCESSORIES Accessories 10 2 Manual 0 5150 This Page Intentionally Blank...