SAFETY PROCEDURES 

 

·

 

Never allow unauthorized persons to operate lift. Thoroughly train new employees in the operation and care of 

the lift. 

·

 

Caution: the power unit operates at high pressure. 

·

 

Remove passengers before raising vehicle. 

·

 

Prohibit unauthorized persons from being in shop area while lift is in use. 

·

 

Total lift capacity is 9,000 lbs. with 2,250 lbs. per arm pad. Never exceed the capacity. 

·

 

When approaching the lift with a vehicle, center the vehicle between the columns so that the tires will clear the 

swing arms easily. Slowly drive the vehicle up between the posts. Have someone outside the vehicle guide the 

driver. 

·

 

Always lift vehicle using all four arms. Never use lift to raise one end or one side of vehicle. 

·

 

Prior to lifting vehicle, walk around the lift and check for any objects that might interfere with the operation of lift 

and safety latches

; tools, air hoses, shop equipment. 

·

 

Raise vehicles about 3

” and check stability by rocking. 

·

 

Prior to lowering vehicle, walk around the lift and check for any objects that might interfere with the operation of 

lift and safety latches

; tools, air hoses, shop equipment.   

·

 

After lowering, swing the arms out of the path and slowly drive the vehicle out. Have someone outside the 

vehicle guide the driver. 

 

ALWAYS LOCK THE LIFT BEFORE GOING UNDER THE VEHICLE. 

NEVER ALLOW ANYONE TO GO UNDER THE LIFT WHEN RAISING OR LOWERING. 

 

 

OWNER / EMPLOYER RESPONSIBILITIES

 

·

 

Shall establish procedures to periodically maintain, inspect and care for the lift in accordance with the 

manufacturer

’s recommended procedures to ensure its’ continued safe operations. 

·

 

Shall provide necessary lockout of energy sources per ANSIZ244.1 

–1982 before beginning any lift repairs. 

·

 

Shall not modify the lift in any manner without prior written consent of the manufacturer.

 

 

 

MAINTENANCE SCHEDULE 

The  following  periodic  maintenance  is  the  suggested  minimum  requirements  and  minimum intervals

; accumulated 

hours or monthly period, whichever comes sooner. If you hear a noise or see any indication of impending failure - 

cease operation immediately

 

– inspect, correct and / or replace parts as required. 

 

Содержание TP9KF-TUX

Страница 1: ...Mar 2019 A TP9KF TUX Two Post Floor Plate Lift Symmetric 9 000 lbs Capacity 2 250 lbs Max per Arm INSTALLATION OPERATION MANUAL...

Страница 2: ...t only part of the vehicle Improper use of this equipment could result in damage to the lift yourself or other property The lift is intended to lift vehicles only It is not designed to lift any person...

Страница 3: ...Screwdriver Locking Needle Nose and Snap Ring Pliers GENERAL INFORMATION 1 Carefully remove the crating and packing materials CAUTION Be careful when cutting steel banding material as items may become...

Страница 4: ...TP9KF TUX Mar 2019 A...

Страница 5: ...Always use architects plans when available Check layout dimension against floor plan requirements making sure that adequate space is available Figs 2 3 4 Fig 2 Elevation Layout 2 OVERHEAD OBSTRUCTION...

Страница 6: ...TP9KF TUX Mar 2019 A Fig 3 Swing Arm Column Layout Fig 4 Column Floor Layout 134 5 8...

Страница 7: ...lifting arms swivel pads height extensions hardware box etc from the column Check the quantity of each item with the parts list If anything is missing please contact your dealer at once STEP 3 Site L...

Страница 8: ...if shimming is required that enough threads are left exposed 6 Using a level check column plumb for every side Fig 6 If shimming is required use supplied Shim stock or 3 4 washers placing shims as clo...

Страница 9: ...r unit is clean Suggestion Use Non Detergent Non Foaming Hydraulic Oil SAE 10 AW 32 or equivalent The unit holds approximately ten quarts of fluid Fig 9 STEP 7 Installing Routing EQUALIZER CABLES 1 Ra...

Страница 10: ...S Cont Cable Routing Diagram Fig 13 5 Repeat above for the second cable 6 Adjust each equalizer cable to approximately 1 2 side to side play Ensure that each cable has equal tension Check the carriage...

Страница 11: ...ight fitting on power unit Secure other hose end to the fitting at the base of the mainside column Tighten to secure Figs 14 15 d Install long hydraulic hose w curved ends between the columns to each...

Страница 12: ...ms Floor Plate Arm Restraints Continued 3 Install Arm Restraint mechanisms to each swing arm as detailed below Fig 17 4 Check for proper engagement for the arm restraints as the gear rack should fully...

Страница 13: ...Fig 18 IMPORTANT The wiring must comply with local code Protect each circuit with time delay fuse or circuit breaker For 208V 230V single phase use 20 amp fuse WARNING Never operate the motor in line...

Страница 14: ...hydraulic system 2 To lower the lift both carriage s safety latch releases must be manually pulled down to be released to lower lift Fig 20 The latches will automatically reset once the lift ascends a...

Страница 15: ...es and drop into each latch stop 8 Press lowering release lever on Power Unit to lower lift onto latches to lock the lift in the proper safety position Note Always lock the lift before going under the...

Страница 16: ...ocking Prior to lowering vehicle walk around the lift and check for any objects that might interfere with the operation of lift and safety latches tools air hoses shop equipment After lowering swing t...

Страница 17: ...d tighten anchors bolts nuts and screws Check wiring switches for damage Keep base plate free of dirt grease or any other corrosive substances Check floor for stress cracks near anchor bolts Check swi...

Страница 18: ...ds for deformation or damage Check cylinder mount for looseness and damage Relocating or changing components may cause problems Each component in the system must be compatible an undersized or restric...

Страница 19: ...lift B Bad capacitor call electrician C Low voltage call electrician D Faulty wiring call electrician 5 Lift jerks going up and down A Air in hydraulic system raise lift all the way to top and return...

Страница 20: ...TP9KF TUX Mar 2019 A POWER UNIT PRIMING WARNING Failure to properly relieve pressure in the following steps can cause injury to personnel...

Страница 21: ...TP9KF TUX Mar 2019 A EXPLODED VIEW 1...

Страница 22: ...TP9KF TUX Mar 2019 A EXPLODED VIEW 2...

Страница 23: ...Rod Arm Restraint 4 15 TP9KF TUX 015 GB91 86 Split Pin 4 16 TP9KF TUX 016 GB97 2 85 Flat Washer 4 17 TP9KF TUX 017 TPF4 200 11 02 Spring 4 18 TP9KF TUX 018 TPF4 200 11 04 Gear Bar Arm Restraint 4 19 T...

Страница 24: ...1 Hyd Hose Long 1 46 TP9KF TUX 046 TPF4 200 01 00 Carriage 2 47 TP9KF TUX 047 DL38G C109A Sliding Rub Block 16 48 TP9KF TUX 048 GB91 86 Split Pin 2 50 TP9KF TUX 050 TPF4 300 00 Lock Latch 2 51 TP9KF T...

Страница 25: ...nsidered a warranty issue and therefore must be noted for any potential recovery with the shipping company The customer is required to notify Tuxedo of any missing parts within 72 hours Timely notific...

Отзывы: