10
TP9KF-TUX
Mar 2019-A
STEP 7
:
(Installing / Routing EQUALIZER CABLES) Cont.
Cable Routing Diagram
Fig. 13
5.
Repeat above for the second cable.
6.
Adjust each equalizer cable to approximately 1/2
” side-to-side play. Ensure that each cable has
equal tension. Check the carriage height to ensure both carriages are sitting on the same latch.
Содержание TP9KF-TUX
Страница 4: ...TP9KF TUX Mar 2019 A...
Страница 6: ...TP9KF TUX Mar 2019 A Fig 3 Swing Arm Column Layout Fig 4 Column Floor Layout 134 5 8...
Страница 21: ...TP9KF TUX Mar 2019 A EXPLODED VIEW 1...
Страница 22: ...TP9KF TUX Mar 2019 A EXPLODED VIEW 2...