13
TP9KF-TUX
Mar 2019-A
STEP 10
:
(Electrical Connection to POWER UNIT)
1. Have a certified electrician make the electrical connection to the power unit. Use a separate circuit for
each power unit, as shown below in
(Fig. 18 & 19)
.
Fig. 18
IMPORTANT! The wiring must comply with local code. Protect each circuit with time delay fuse or
circuit breaker. For 208V-230V single phase, use 20 amp fuse.
WARNING!! Never operate the motor in line voltage less than 208VAC as motor damage may occur.
Fig. 19
NOTE:
TP9KF-TUX Lift model does not
require or provide connection for
Overhead Limit Switch Mechanism
due to lift being ‘open top’ with no
overhead beam structure.
Содержание TP9KF-TUX
Страница 4: ...TP9KF TUX Mar 2019 A...
Страница 6: ...TP9KF TUX Mar 2019 A Fig 3 Swing Arm Column Layout Fig 4 Column Floor Layout 134 5 8...
Страница 21: ...TP9KF TUX Mar 2019 A EXPLODED VIEW 1...
Страница 22: ...TP9KF TUX Mar 2019 A EXPLODED VIEW 2...