58
mWing
Installation and mounting
2. Mark the outline of the base frame on the floor. Make sure that the
markings are either washable or invisible.
3. Mark the outline of the base frame on the floor. Make sure that the
markings are either washable or invisible.
Mag00854
Fig. 28: Mark outline
4. Put the base frame aside. The underside must face upwards.
5. Clean the floor with the "HaftClean" surface cleaner.
6. Clean the underside of the base frame with the "HaftClean Metall" surface
cleaner.
7. Apply construction adhesive "Klebt + D Dicht Power" to the floor in the
form of a beat within the marking. Apply less construction adhesive
towards the edge.
Mag01
104
Fig. 29: Applying construction adhesive
www.TURNSTILES.us | [email protected] | 303-670-1099