52
mWing
Installation and mounting
7.10.2 Mounting variant 2
With this mounting variant, first mount the base frame on the foundation or
on the unfinished floor. Use threaded rods to position the base plate at the
desired height. After completion of the finished floor, mount the pedestrian
gate on the base plate. The threaded rods are set in concrete.
Required material (not included in the scope of delivery):
›
Base frame FURA100
›
Attachment set BSSFURA100 for mounting the pedestrian gate
›
Attachment set BSS100 for mounting the base frame, alternatively
customer-supplied fastening material
Before finishing the finished floor – mounting and preparing the base frame
Requirements
›
The foundation / unfinished floor has been built.
›
The empty conduits were laid.
›
The foundation / unfinished floor has hardened.
Foundation and empty conduit plan:
Page 39, Fig. 11 and
Base frame FURA100:
Base plate FlowMotion:
www.TURNSTILES.us | [email protected] | 303-670-1099