TECHNIC FUNCT. VERIFIC.

 

ENTER

  

Run TFV?Y 

ENTER

 <TFV procedure > 

TFV OK

TFV Technical Functionality Verification 

(this step requires the FGA-TFV kit be available)

Archway and operator’s condition are as for the FGA step.

The test procedure is detailed in the instructions included in the TFV kit.

FGA Adjustment and TFV Technical Functionality Verification steps are automatically skipped in case the specific model 
or the customized configuration does not support these features. 

ENVIRON ADJUST.

 

ENTER

  

Run ENA?Y 

ENTER

  <noise adjustment> 

ENTER

 <noise verification>

Evaluation and Compensation of Environmental Interferences: 

the equipment measures the

noise level due to possible interference sources of an electrical nature only present in the
environment and changes the settings, if necessary, to minimise it. At the end of the process, the
message ‘

ENA END

’ appears, together with the result (example: ‘

COVERAGE 100% NOISE

< 20%

’). The procedure ends with a noise verification. The noise measurement phase can be

prolonged indefinitely to capture a non-repetitive interference.

This step is automatically skipped if a customized security level is selected (see also IS parameter) or the specific
detector model does not support the ENA function.

GENERAL NOISE

  

ENTER

   <general noise measurement> 

ENTER

General Environmental Noise Measurement

: the equipment starts measuring the noise level

due to possible interference sources present in the environment, both of a mechanical and an
electrical nature. Pass through the MD in the following configuration:

Eliminate personal metal effects;

Actuate the whole access system;

Activate any electrical devices that may cause interference;

Subject the objects and furniture in the access system to normal and above-normal stress
(hit the furniture, drop a piece of luggage heavily onto the X-ray unit belt, … );

Subject the floor to normal and above-normal stress (walk heavily, change direction,  …).

In case of strong gusts of air or wind 

EVA function

 can be useful to compensate archway vibrations. 

If repetitive movements of innocuous big metal objects (f.i.  a metal trolley) can occur near the archway  

SENT parameter

 

can be adjusted to avoid false alarms (only if photocell modules are installed).

 

During the test verify the noise level shown on the display: 

0…3 

acceptable interference level. 

4…8 

above normal interference level: the equipment is operational, but a corrective 
action on any possible interference source around the MD is recommended. 

>8 or alarm indication

unacceptable interference level: the equipment is NOT operational: a corrective 
action on any possible interference source around the MD is required. 

ELECTR. NOISE  

ENTER

   <electromagnetic noise measurement> 

ENTER

Environmental Electromagnetic Noise Measurement:

 the equipment starts measuring the

noise level due to possible interference sources present in the environment, of an electrical
nature only. Activate any electrical devices that may cause interference (motors, monitors, …)
and verify the noise level shown on the display:

0…3 

acceptable interference level.

4…8 

above normal interference level: the equipment is operational, but a corrective 
action on any possible interference source around the MD is recommended. 

>8 or alarm indication

unacceptable interference level: the equipment is NOT operational: a corrective 
action on any possible interference source around the MD is required. 

OTS END   

ENTER

End of the OTS procedure

Excessive Environmental Interferences

: in case ENA step results in a coverage less than 100% and/or an excessive

noise level is indicated by EN/GN functions, the installation compatibility should be improved. Apply the following
countermeasures:

- Carry out a corrective action on any possible interference source around the MD (see ‘Preliminary Layout Inspection and
Positioning’  section).

303-670-1099

Содержание 02PN20

Страница 1: ...lutions each model offers the best cost performance ratio for its specific application Options Some functions parts indicated as options in this manual are included as default in high level models Ell...

Страница 2: ...S TO THE LOCAL PROGRAMMING PHASE USING THE PASSWORD 31 4 3 2 FREE ACCESS TO LOCAL PROGRAMMING PHASE WITHOUT PASSWORD 31 4 3 3 COMMAND EXECUTION IN LOCAL PROGRAMMING 32 4 3 4 EXIT FROM LOCAL PROGRAMMIN...

Страница 3: ...n of the earth ground safety terminal will render the device dangerous Intentional cutting or disconnection is strictly forbidden Whenever there is any suggestion that the level of protection has been...

Страница 4: ...ially dangerous substances Do not short circuit the contacts serious risk of burning and breakage Do not dispose of battery in fire danger of explosion Any maintenance or repair involving the device b...

Страница 5: ...c casing or metal casing is designed to be attached directly to the crossbar of the archway An embedded Infra Red interface allows the use of an accessory remote control unit which acts as the control...

Страница 6: ...na Rf Reflectors for transit counting options on column version C1 crossbar fitted with holes for mounting the control unit C2 crossbar without holes panel shape version K ON OFF special key Indicator...

Страница 7: ...et LAN interface Web server for set up and remote data log Real Time clock with battery backup Non volatile Memory for Metal Detector events storage wireless Wi Fi interface APSIM3Plus version only su...

Страница 8: ...is intended for upgrading the standard version to outdoor applications according to IEC 60950 22 This kit includes shelters crossbar protection covers for power supply and waterproof power supply ada...

Страница 9: ...mperature 20 C to 70 C on demand 37 C to 70 C Storage temperature 37 C to 70 C Relative humidity 0 to 95 without condensation Standard Version UW 115 4 5 UW 50 2 630 00 24 3 4 6 5 1 4 UW 2255 88 8 205...

Страница 10: ...30 24 8 6 5 1 4 2050 80 7 UW 115 4 5 UW 50 2 UW 170 6 7 UW 660 00 26 340 13 4 UW 155 6 1 2035 80 1 2275 89 6 401 15 8 440 17 3 990 39 560 22 UW 362 14 3 Dimensions UW 720mm OPTION 760mm or 820mm panel...

Страница 11: ...ration This configuration can be applied in outdoor sheltered permanent installations or outdoor non sheltered short term installations single event entrance 3 1 1 Examples of possible sources of inte...

Страница 12: ...ced in direct contact with the MD 6 Sources of vibration Unstable Floor The MD gate shall be anchored to a stable floor Avoid installing on wood or metal platforms unless necessary In this latter case...

Страница 13: ...y the Security Authority Components needed Unpacking Scissors and Pliers Phillips screwdriver n 1 Kit C E I A FGA TFV Metal free clothes Clean Tester Tracksuit Gym shoes No metal personal effects meta...

Страница 14: ...RX parts Configuration A Configuration B Configuration A Configuration B XRU XRU XRU XRU Configuration A Configuration B Configuration A Configuration B Typical application fitted with two Metal Detec...

Страница 15: ...mp protection cover of the lower connection module ccp protection cover of CU control unit and C1 crossbar cp protection cover of C2 crossbar Pictures of main components Positioning the panels Tilt do...

Страница 16: ...t of the panel taking care that the logo is facing the floor Attach the C2 crossbar with no holes to the upper part of the panel making sure that the logo is facing up RX C1 C2 Configuration B with TX...

Страница 17: ...en key AW2 or TX1 to free them Configuration A Lift the archway placing it on the supports S1 and S2 Attach the control unit to the lower crossbar using vc screws and AW2 Allen key included in the ins...

Страница 18: ...g panel connector Lock the cable connectors using the short screwdriver cK included into the installation kit Insert the cables into the crossbar groove Fix the cables in position using the clips on t...

Страница 19: ...C2 Each cap s secured by a short cord to a cable clip Remount covers cp Attach the protection cover ccp of the crossbar C1 using the hooks h and the knobs vp taking care to push it towards the panel c...

Страница 20: ...river photocell vc control unit mounting screw PC Protection covers ccp protection cover of CU control unit and C1 crossbar Pictures of main components Positioning the columns Place F spacers on the f...

Страница 21: ...les for the control unit close to the TX column Insert the crossbar guide pins into the holes on the inside of the column Configuration A TX RX Configuration B with TX column on the right when facing...

Страница 22: ...guration B Connecting the control unit Connect the cables coming from the control unit as illustrated in the figure below Connect each cable to the column connector winding the cable in excess if nece...

Страница 23: ...PH2 AW Photocells Reflectors Phillips screwdriver and Allen wrench included in the installation kit Remove the pc cap using AW key pc Open the Ph photocell module using a PH2 cross head screwdriver Pa...

Страница 24: ...ability and acting as an adapter allow the archway to be easily relocated In order to prevent the archway from tipping over in case of bumps the stable anchoring to the ground is anyway mandatory Meta...

Страница 25: ...ribed in the previous step but passing the output cable of the AC DC adapter through one of the strain reliefs present on the protection cover Connect the input cable of the AC DC adapter to the mains...

Страница 26: ...ext step use the UP and DOWN keys to change a numeric value or an answer Y yes to N no and vice versa In the following any operator s action is indicated between and OTS function can be executed also...

Страница 27: ...TX mains ALARM VOLUME SELECT ENTER AV ENTER Selection of the Alarm Volume MINIMUM VOLUME SELECT ENTER MV ENTER Selection of the Minimum Volume lower limit for alarm volume adjustment ALARM TONE SELEC...

Страница 28: ...onto the X ray unit belt Subject the floor to normal and above normal stress walk heavily change direction In case of strong gusts of air or wind EVA function can be useful to compensate archway vibra...

Страница 29: ...d to be compatible For safety reasons anchoring the unit to the floor is mandatory Anchoring methods shall be agreed prior to proceeding with the following steps Marble or tiled floors or Carpeted flo...

Страница 30: ...o bumps or mechanical exertion 3 7 Personalisation 3 7 1 Settings check If required by the specifications of the Security Authority change the programming setting to refine the operating mode Enter pr...

Страница 31: ...will be terminated automatically if no commands are entered for a period of 2 minutes 4 3 Local programming Use the keypad on the inside panel of the control unit The PROG key is used to enter and ex...

Страница 32: ...ower supply and serial communication cables together in order to avoid loops ATTENTION in order to avoid any damage to the PC s interface make sure that the cable does not include a connection to pin...

Страница 33: ...TER P _10000 number of passages through the antenna TA_ 2350 the total number of passages with alarm TR_23 5 the alarms passages ratio as a percentage MA_ 1500 number of passages with alarm due to a m...

Страница 34: ...92 168 0 101 IP I192 168 0 101 IS International Security Standard 1 30 C R Selects a security level corresponding to an international standard During normal operation the current Security Level is dis...

Страница 35: ...stance will be required from C E I A personnel OFV Functionality check at operator level C Activates the OFV test For details of the procedure see the instructions included in the OFV kit OTS One Touc...

Страница 36: ...ach command is changed by entering the opposite value to the current one to the right of the character If the user does not wish to change the command state he she can simply press ENTER and the curso...

Страница 37: ...ction module power indicator entry pacing lights entry side GREEN transit allowed RED busy transit not allowed zone alarm indication exit side in case of alarm a group of LEDs lights up to pinpoint th...

Страница 38: ...l be performed according to local Security Authority procedures taking into account that The indication given through light bars that illuminate where the presence of an object is detected is solely m...

Страница 39: ...ming phase starts the last used command will appear Press the arrow keys to select the AV Alarm Volume or AT Alarm Tone function if a different one is displayed Press the ENTER key to change the AV se...

Страница 40: ...eiver antenna A in the form of an archway made up of a transmitter part TX a receiver part RX a power supply adapter PSA FG PCU TX RX A CU PSA R RX PSA TX CU RX PSA TX CU Block diagram of a metal dete...

Страница 41: ...e calibration Test piece specified by the Security Standard in use 12 months mandatory Battery replacement Supplied Allen Key N 5 2 batteries Recommended 3 years maximum 5 years 6 2 Diagnosis Generic...

Страница 42: ...ing a chip card try at first to perform again the operation completely and correctly If the self diagnosis message appears again carry out the recommended action listed in the following table Display...

Страница 43: ...out FGA step Increase LC parameter setting Excessive sensitivity at ground level f i detection of shoes Excessive sensitivity at ground level Start OTS procedure and carry out FGA step Decrease LC pa...

Страница 44: ...rtment with batteries 49510 49510 49510 49510 49510 Pb 12V 9Ah battery 36891 36891 36891 36891 36891 100 240V 100W IP67 Power supply adaptor 48092 48092 48092 48092 48092 100 240V 80W Power supply ada...