
Traverse Installation and Commissioning Guide, Section 11: Node Start-up and Commissioning Procedures
Before You Begin
Page 11-2
Turin Networks
Release TR3.2.1
All cabling is installed.
•
Alarm, Timing, and Management Cabling
•
Network Interface Cabling Procedures
Chapter 1—“Network Interface Cabling Overview,” page 8-1
•
Power Installation and Cabling Procedures
Chapter 1—“Power System Overview,” page 10-1
Polarity and voltage testing is
complete.
Power Installation and Cabling Procedures
Chapter 4—“Battery and Battery Return Supply”
•
•
Note:
Once testing is complete, plug fuses into the
fuse panel.
Power is turned on to the Traverse.
Important:
Switch on power to the Traverse
shelves and fan trays at the power system before
placing any cards in the shelf.
A PC or laptop with hyperterminal
or other VT-100 terminal emulation
software.
n/a
A standard, straight-through serial
port cable with:
•
9-pin RS-232-C (DB-9) male
connector on one end (to connect
to the General Control Module
card)
•
A 9-pin or 25-pin RS-232-C
(DB9 or DB-25) connector to
match the connector on your PC
Alarm, Timing, and Management Cabling
, Chapter 3—“Management Interface Cabling,”
RS-232 DTE Interface Connection
CLI command reference
TransNav Management System CLI Guide
Required node commissioning
parameters.
Note:
IP address
information is typically
provided by your local
network administrator and is
required for management
purposes. Traverse node IP
addresses should be allocated
from the same domain.
•
Network administrator
•
Required Node Commissioning Parameters
•
TransNav Management System Product Overview Guide,
Conditional node commissioning
parameters.
Conditional Node Commissioning Parameters
Table 11-1 Node Start-up Requirements (continued)
Requirement
Reference
Содержание TransNav
Страница 5: ...Release TR3 2 1 Turin Networks Page iii Installation and Commissioning Checklists 12 21 Index Index 1 ...
Страница 6: ...Page iv Turin Networks Release TR3 2 1 ...
Страница 14: ...Traverse Installation and Commissioning Guide Calling for Repairs Page xii Turin Networks Release TR3 2 1 ...
Страница 101: ...Chapter 1 Power Interface Specifications PDAP 4S Release TR3 2 1 Turin Networks Page 4 3 ...
Страница 316: ...Traverse Installation and Commissioning Guide Section 12 Appendices Page ii Turin Networks Release TR3 2 1 ...
Страница 361: ......
Страница 362: ...Visit our website at www turinnetworks com Release TR3 2 1 Traverse System Documentation 800 0002 TR321 ...