Traverse Installation and Commissioning Guide, Section 10: Power Installation and Cabling Procedures
Required Equipment and Tools
Page 10-8
Turin Networks
Release TR3.2.1
wire) and battery return distribution (RETURN) cables (e.g., #8 AWG or 9 mm
2
for
PDAP-4S or -2S, #12 AWG or 3.3 mm
2
for PDAP-15A black or blue copper area
wire) to the Traverse backplane
•
8 – #8-32 SEMS screws to connect battery distribution (-48VDC) and battery
return distribution (RETURN) cables to the Traverse backplane
•
A common power return jumper plate to prevent faulty wiring short circuit. This
item comes pre-installed at the common return (RETURN_A RETURN_B) power
terminals on the bottom-center of the Traverse backplane
•
A 1/4-inch socket (or nutdriver) for Traverse shelf backplane power terminal
connections
PDAP-4S only
•
2 – battery distribution (-48VDC) cables (e.g., #8 AWG or 9 mm
2
red or gray
copper area wire)
•
2 – battery return distribution (RETURN) cables (e.g., #8 AWG or 9 mm
2
black or
blue copper area wire)
•
4 – #10 single-hole copper barrel cable lugs to connect battery distribution
(-48VDC) cables (e.g., #8 AWG or 9 mm
2
red or gray copper area wire) and battery
return distribution (RETURN) cables (e.g., #8 AWG or 9 mm
2
black or blue copper
area wire) to the PDAP-4S
•
4 – #10-32 KEP nuts to connect battery distribution (-48VDC) and battery return
distribution (RETURN) cables to the PDAP-4S
•
A 5/16-inch (8 mm) socket
•
For further information, refer to the Telect website at
and request
publication number #009-8005-1404.
PDAP-15A only
•
2 – battery distribution (-48VDC) cables (e.g., #12 AWG or 3.3 mm
2
red or gray
copper area wire)
•
2 – battery return distribution (RETURN) cables (e.g., #12 AWG or 3.3 mm
2
black
or blue copper area wire)
•
4 – #6 single-hole copper barrel cable lugs to connect battery distribution
(-48VDC) cables (e.g., #12 AWG or 3.3 mm
2
red or gray copper area wire) and
battery return distribution (RETURN) cables (e.g., #12 AWG or 3.3 mm
2
black or
blue copper area wire) to the PDAP-15A
•
4 – SEMS screws to connect battery distribution (-48VDC) and battery return
distribution (RETURN) cables to the PDAP-15A
•
A Phillips screwdriver
•
For further information, refer to the Telect website at
and request
the specification sheet for publication number #T009-92222112711
Содержание TransNav
Страница 5: ...Release TR3 2 1 Turin Networks Page iii Installation and Commissioning Checklists 12 21 Index Index 1 ...
Страница 6: ...Page iv Turin Networks Release TR3 2 1 ...
Страница 14: ...Traverse Installation and Commissioning Guide Calling for Repairs Page xii Turin Networks Release TR3 2 1 ...
Страница 101: ...Chapter 1 Power Interface Specifications PDAP 4S Release TR3 2 1 Turin Networks Page 4 3 ...
Страница 316: ...Traverse Installation and Commissioning Guide Section 12 Appendices Page ii Turin Networks Release TR3 2 1 ...
Страница 361: ......
Страница 362: ...Visit our website at www turinnetworks com Release TR3 2 1 Traverse System Documentation 800 0002 TR321 ...