
Traverse Installation and Commissioning Guide, Section 6: Precautions and Common Procedures
Environmental Precautions
Page 6-2
Turin Networks
Release TR3.2.1
Environmental
Precautions
Hardware
Installation
Precautions
Important:
Traverse systems are designed to comply with
GR-1089-CORE, GR-63-CORE, and CE Mark requirements. Install and
operate the Traverse system in environments that do not expose wiring,
cabling, or connectors to the outside plant. Acceptable applications
include Central Office Environments (COEs), Electronic Equipment
Enclosures (EEEs), Controlled Environment Vaults (CEVs), huts, and
customer premises environment.
The Traverse systems are classified as being powered by Class A1
voltages per GR-1089-CORE.
The Traverse system design supports installation in locations with
restricted access.
Important:
Always use caution while working in an environment with
rotating or moving equipment parts (e.g., fan modules).
Important:
This symbol is on the product and means do not discard Turin
products into residential or commercial waste.
Most countries or regions have established methods and
procedures to collect and recycle electronic and electrical
waste. Contact your local authorities for established
procedures. If no local procedures are available, contact the
Turin Networks Technical Assistance Center (TAC).
Important:
Always use thread-forming screws when installing a Traverse
shelf to ensure electrical continuity. This is especially critical when
installing equipment in a rack coated with a non-conductive coating.
Important:
To ensure proper air flow, 3/8-inch (9.5 mm) of space is
required between the Fuse Panel and the first Traverse 1600 or Traverse
2000 shelf in a standard horizontal-mount installation.
Important:
Traverse 2000 shelf installation into a 19-inch (483 mm) wide
telco rack is a standard-mount only—5 inch (127 mm) forward. A
flush-mount configuration is not currently available.
Содержание TransNav
Страница 5: ...Release TR3 2 1 Turin Networks Page iii Installation and Commissioning Checklists 12 21 Index Index 1 ...
Страница 6: ...Page iv Turin Networks Release TR3 2 1 ...
Страница 14: ...Traverse Installation and Commissioning Guide Calling for Repairs Page xii Turin Networks Release TR3 2 1 ...
Страница 101: ...Chapter 1 Power Interface Specifications PDAP 4S Release TR3 2 1 Turin Networks Page 4 3 ...
Страница 316: ...Traverse Installation and Commissioning Guide Section 12 Appendices Page ii Turin Networks Release TR3 2 1 ...
Страница 361: ......
Страница 362: ...Visit our website at www turinnetworks com Release TR3 2 1 Traverse System Documentation 800 0002 TR321 ...