Release TR3.2.1
Turin Networks
Page 7-17
SECTION 7+HARDWARE INSTALLATION PROCEDURES
Chapter 3
Traverse 2000 Installation into a 19-inch Rack
Introduction
For hardware installation overview and guidelines, refer first to Chapter 1—“Traverse
System Rack Installation Overview,” page 7-1.
This chapter provides the following information and procedures to complete a vertical-
and standard 5 inch (127 mm) forward-mount installation of the Traverse 2000 system
into a standard 7-foot (2133.6 mm) high, 19-inch (483 mm) wide telco rack.
•
Vertical Traverse 2000 Rack Configuration
•
Install the Horizontal Rack Adapter Brackets
•
Install the Front Inlet Fan Tray Holder in a 19-inch Rack
•
Содержание TransNav
Страница 5: ...Release TR3 2 1 Turin Networks Page iii Installation and Commissioning Checklists 12 21 Index Index 1 ...
Страница 6: ...Page iv Turin Networks Release TR3 2 1 ...
Страница 14: ...Traverse Installation and Commissioning Guide Calling for Repairs Page xii Turin Networks Release TR3 2 1 ...
Страница 101: ...Chapter 1 Power Interface Specifications PDAP 4S Release TR3 2 1 Turin Networks Page 4 3 ...
Страница 316: ...Traverse Installation and Commissioning Guide Section 12 Appendices Page ii Turin Networks Release TR3 2 1 ...
Страница 361: ......
Страница 362: ...Visit our website at www turinnetworks com Release TR3 2 1 Traverse System Documentation 800 0002 TR321 ...