7
USE AND OPERATION
30/58
561270 - IS19/07 - EN
7.3
CHECKS BEFORE START-UP
The oil level and the coolant level should be checked with the machine switched off.
- Check the level of the liquid inside the expansion vessel (FIG. 30-REF. 1) above the heat exchanger. To top up the liquid
unscrew the cover (FIG. 30-REF. 2) on the machine casing above the tank.
FIG. 30
- Check the motor oil level (FIG. 31-REF. 1); the level should be close to the maximum mark. The motor oil refilling cap (FIG.
31-REF. 2) is located on the cylinder head; to add oil unscrew the cover on the machine casing above the engine.
FIG. 31
- Check the hydraulic oil level through the inspection window (FIG. 32-REF. 1); as a rule, the oil level should reach the middle
of the window (with the machine switched off and cooled down). The refilling cap (FIG. 32-REF. 2) is located above the tank. To
add oil, unscrew the cover on the casing above the hydraulic oil tank.
Содержание Beton Master
Страница 1: ...Serial number Year OPERATION AND MAINTENANCE MANUAL BETON MASTER IS19 07 561270 EN ORIGINAL ...
Страница 2: ......
Страница 5: ...11 2 WARRANTY 57 ...
Страница 6: ......
Страница 8: ...1 CE DECLARATION 8 58 561270 IS19 07 EN ...
Страница 14: ...3 TECHNICAL DESCRIPTION 14 58 561270 IS19 07 EN ...
Страница 18: ...4 TRANSPORTATION AND HANDLING 18 58 561270 IS19 07 EN ...
Страница 24: ...5 INSTALLATION 24 58 561270 IS19 07 EN ...
Страница 28: ...6 SAFETY 28 58 561270 IS19 07 EN ...
Страница 52: ...9 SCRAPPING 52 58 561270 IS19 07 EN ...
Страница 55: ...TROUBLESHOOTING 10 561270 IS19 07 EN 55 58 ...
Страница 56: ...10 TROUBLESHOOTING 56 58 561270 IS19 07 EN ...
Страница 58: ...11 RESPONSIBILITY OF THE OPERATOR 58 58 561270 IS19 07 EN ...