U s e r I n s t r u c t i o n s
Eco-Net 128 Control Unit
InMn 26 UCESTD
it Rev.1.02
TURBO s.r.l.
Dust Filter Components
Via Po 33/35 20811 Cesano Maderno (MB) Italy Tel ++39 0362 574024 Fax ++39 0362 574092
9
Layout of connection to the valve actuators Bus
Connect the valves actuators Bus to connector P11, respecting the following positions:
Pos.
P11
Description
Notes
27
Green wire
0 V
28
White wire
Bus digital signal
29
Brown wire
+24Vdc
The cable used for wiring must be of the following type:
H05VV-F 0.75mm
2
–
19AWG.
The cable connected to the P11 connector of the Eco-Net 128 control unit, must be introduced into the
“IN” port of the first valve actuator present on the chain, using a PG7 type connector, complete with
seals supplied, to guarantee the IP sealing of the circuit.
Successively, jumpered wiring must be realised from the “OUT” port of the first actuator, for connection
to the “IN” port of the next valve actuator, using the same measures illustrated above.
Repeat the same operation up to the last valve actuator of the bus. A PG7 closing connector must be
mounted on the “OUT” port of the last actuator, without cables but with the rubber cap supplied.
Below find a typical actuators Bus connection layout:
To realise the connection cable for the "IN" and "OUT" ports of
the valve actuators, the indications must be followed:
Pos.
Description
Notes
1
Brown wire
+24 V
2
White wire
Digital signal
3(GND)
Green wire
0 V