![TuffStuff TDH-345 Скачать руководство пользователя страница 11](http://html1.mh-extra.com/html/tuffstuff/tdh-345/tdh-345_owners-manual_1179531011.webp)
ig. 29
Route the end of the
Lat Cable (#53)
through the
Top Pulley
Housing (#1)
tube. Next, pull gently the
Lat Cable (#53)
down through the
lot on the bottom side of the
Top Pulley Housing (#1)
.
Caution:
Do not pull the
Lat Cable (#53)
all the way through the
Top
Pulley Housing (#1)
until you have installed the Nylon Pulley 4 1/2”
Rd. (#20-Labeled B), as this will prevent any damage to the
Cable
.
See
Fig. 30.
Note:
Refer to the Cable Mapping Diagram on page 18 for further
detailed illustration of the
Lat Cable (#53)
routing.
Fig. 30
Insert one Nylon Pulley 4 1/2” Rd. (#20-Labeled B) into the slot o
the
Top Pulley Housing (#1)
, in the position as shown above, and secure
into place using one Hex Head Cap Screw 3/8-16 X 2 1/2 (#29), two Fla
Washers SAE 3/8” (#45), and one Nylon Insert Jam Lock Nut 3/8-16 (#46)
Be sure the
Lat Cable (#53)
is routed properly into the pulley’s groove.
Note:
Refer to the Cable Mapping Diagram on page 18 for furthe
detailed illustration of the
Lat Cable (#53)
routing.
ig. 31
Secure the
Top Pulley Housing (#1)
to the
Center Upright (#19)
sing one Hex Head Cap Screw 3/8-16 X 2 3/4 (#33), two Flat Washers
SAE 3/8” (#45), and one Nylon Insert Jam Lock Nut 3/8-16 (#46).
Caution:
To prevent damage to the
Lat Cable (#53)
, it is important to
make sure that the
Lat Cable (#53)
is routed over the top, and not
under the Hex Head Cap Screw 3/8-16 X 2 3/4 (#33).
Fig. 32
Assemble the two
Double Pulley Plates (#21)
using two Nylo
Pulleys 4 1/2” Rd. (#20-Labeled C and F), two Hex Head Cap Screws 3/8
16 X 1 3/4 (#30), four Flat Washers SAE 3/8” (#45), and two Nylon Inser
Jam Lock Nuts 3/8-16 (#46).
Note:
The four holes on the
Double Pulley Plates (#21
) are used t
adjust the cable tension once the cable routing has been completed.
TDH 345 Half Cage Ensemble
10
y