![Tubeline TL60ECV Скачать руководство пользователя страница 30](http://html1.mh-extra.com/html/tubeline/tl60ecv/tl60ecv_operators-manual_1179180030.webp)
TL60ECV
-
Section 7: Operation 7-1
Section 7: Operation
Balewrapper Starting
1. Read engine manual to familiarize yourself with its functions.
2. Choke
(A)
engine if cold starting.
3. Turn engine key
(B)
to START until engine runs. Do not hold
more than 5 seconds.
4. Slowly throttle
(C)
engine as it warms up.
5. Switch control panel on and select manual wrap mode, refer
.
B
A
C
Starting a Bale Row
1. Place wrapper at start of desired row.
1. Disengage transport lock, see
.
2. Raise rear roller bed using control screen. Refer
3. Fold tongue and pin to steering slider tube. See
Fig.1
.
4.
Confirm balewrapper is steering straight.
5. Place several unwrapped bales at end of row to
act as stop, thus creating compacted bale row.
6.
Lift first bale to height that will allow endcap to be
placed over end of bale.
7.
Place first bale onto bale deck.
8.
Run first few bales through wrap chamber using
manual wrap mode and with the rear cam axle
and
Fig.2.
9. Adjust control screen settings according to bale
size. Refer to
Setup Screen
.
10. Lower rear cam axle to ground using control
screen before engaging auto wrap mode.
Fig .1
20hp shown .
Fig .2
Fig .1
Folded for steering .
Extended for transport .
Содержание TL60ECV
Страница 7: ...Intentionally Left Blank...
Страница 12: ...TL60ECV Section 2 Safety 2 3 Clearance Markers Part No DEAMBER Part No DERED...
Страница 13: ...2 4 Section 2 Safety TL60ECV Safety Decal Locations NOTE Decals shown are not to scale...
Страница 39: ...11 1 Section 11 Diagnostics TL60ECV Section 11 Diagnostics Manifold Solenoid Functions...
Страница 59: ...VII Imperial Torque Value Chart TL60ECV Imperial Torque Value Chart...
Страница 60: ...TL60ECV Metric Torque Value Chart VIII Metric Torque Value Chart...