![Tubeline TL60ECV Скачать руководство пользователя страница 18](http://html1.mh-extra.com/html/tubeline/tl60ecv/tl60ecv_operators-manual_1179180018.webp)
TL60ECV
-
Section 3: Setup 3-1
Section 3: Setup
Dealer Installation
Upon delivery the following parts will need to be installed to make the TL60ECV field ready:
1. Refer to
Parts Manual
to ensure
all hardware and parts have been
delivered.
2. Remove all banded parts from
either bale deck or roller bed.
3. Install bottom safety guard mounts
using bolts, washers and nuts. Left
side shown in
Fig.1
, right side is
the same.
4. Install left safety guard by bolting at pivot point. Do
not over tighten. See
Fig.2
.
5. Close pivoting left safety guard top slot over safety
guard mount hook.
6. Check left safety guard range of motion.
7. Lock rubber latch at rear of safety guard.
8. Ensure door switch contacts left safety guard when in
closed position. Refer to
Adjustments
,
Fig .1
Fig .2
Содержание TL60ECV
Страница 7: ...Intentionally Left Blank...
Страница 12: ...TL60ECV Section 2 Safety 2 3 Clearance Markers Part No DEAMBER Part No DERED...
Страница 13: ...2 4 Section 2 Safety TL60ECV Safety Decal Locations NOTE Decals shown are not to scale...
Страница 39: ...11 1 Section 11 Diagnostics TL60ECV Section 11 Diagnostics Manifold Solenoid Functions...
Страница 59: ...VII Imperial Torque Value Chart TL60ECV Imperial Torque Value Chart...
Страница 60: ...TL60ECV Metric Torque Value Chart VIII Metric Torque Value Chart...