EN
8
Operating manual – turbo fan TFV 10 / TFV 20 / TFV 30
TFV 20
11
10
8
1
No.
Designation
1
Switch for fan stage selection
8
Service power socket
10
Electricity meter LED
11
Dual counter (operating hours counter and MID-certified
kilowatt hours counter)
TFV 30
9
8
10
11
No. Designation
8
Service power socket
9
Rotary switch for fan stages
10
Electricity meter LED
11
Dual counter (operating hours counter and MID-certified
kilowatt hours counter)
Switching the device on
Once you have completely installed the device as described in
the Start-up chapter, you can switch it on.
TFV 10
1. Set the selection switch (1) to the desired fan stage.
stage 1 = I
stage 2 = II
ð
The device is switched on.
TFV 20
1. Set the selection switch (1) to the desired fan stage.
stage 1 = I
stage 2 = II
ð
The device is switched on.
TFV 30
1. Set the rotary switch (9) to the desired fan stage.
stage 1 = LOW
stage 2 = MEDIUM
stage 3 = HIGH
ð
The device is switched on.
Dual counter (TFV 20 and TFV 30)
The devices
TFV 20
/
TFV 30
are equipped with a dual
counter (11). The operating hours are indicated in the upper
section of the counter, the kilowatt hours are displayed just
below. The kWh counter is certified according to MID. The
LED (10) is illuminated as soon as a current flow is established.
Using the service socket
The
TFV 20
/
TFV 30
are equipped with a service socket, which
means that you can operate another device via the same
socket. The service socket is ready for operation as soon as the
devices are connected to the mains – they do not need to be
switched on.
Shutdown
Warning of electrical voltage
Do not touch the mains plug with wet or damp hands.
•
Set the fan stage selection switch (1) to position
0
(centre)
or else the rotary switch (9) to
OFF
.
•
Hold onto the mains plug while pulling the power cable out
of the mains socket.
•
Clean the device according to the Maintenance chapter.
•
Store the device according to the Storage chapter.