![Triumph 184.1 Скачать руководство пользователя страница 24](http://html1.mh-extra.com/html/triumph/184-1/184-1_technical-bulletin_1169740024.webp)
24 of 24
Technical Bulletin
Issue
1
First Check
Within seven days of receipt of the motorcycle:
• Remove the battery from the motorcycle packing crate.
• Remove and discard the battery packaging.
• Check the battery VIN label matches the motorcycle VIN.
• Using a multimeter of known calibration, check the battery voltage.
• Charge the battery if necessary.
• Record the motorcycle details, battery details and results of the first battery voltage check on the YTZ
Factory Activated Battery Condition Log Sheet.
Four Monthly Check
• Check the battery voltage every four months until Pre-Delivery Inspection and handover to the
customer.
• Charge the battery if necessary.
• Record the details of each four monthly check on the YTZ Factory Activated Battery Condition Log
Sheet.
Pre-Delivery Inspection Check
• Perform a final battery voltage check before handover to the customer.
• Charge the battery if necessary.
• Record the details of the Pre-Delivery Inspection check on the YTZ Factory Activated Battery Condition
Log Sheet.
• Retain the YTZ Factory Activated Battery Condition Log Sheet for your records. A correctly completed
battery log sheet will be required to support any warranty claims.
Circulation
Initial and date when read and return to central file holder
Service Manager Parts Manager
Sales Manager
Workshop
Supervisor
Technician 1
Technician 2