WARNING!
Before normal operation of the
shower, it is essential the following
commissioning procedure is completed
correctly.
the first operation of the shower is intended
to flush out any remaining unit debris, and to
guarantee that the heater unit contains water
before the elements are switched on. this
operation must be carried out with the flexible
hose screwed to the outlet but without the
showerhead attached. Make sure the outlet of
the flexible hose is directed to waste.
Before turning on the electric and mains water
supplies to the shower, make sure that the
power selector is at the ‘StOP’ position
(fig.)
and the temperature control is rotated fully
clockwise to ‘10’, the minimum flow position
(fig.)
.
Note:
Failure to turn the control to ‘10’ may
cause the PRD to operate.
turn on the mains water supply to the shower
at the isolating stop valve and then turn on the
electric supply to the shower at the isolating
switch. the power indicator will light.
Switch the power selector to the ‘COlD’ position
(fig.9)
and wait until water starts to flow from
the flexible hose.
Slowly rotate the temperature control fully anti-
clockwise to ‘1’, the maximum flow position
(fig.0)
.
It will take about thirty seconds for a smooth
flow of water to be obtained whilst air and any
debris is being flushed from the shower.
When a smooth flow of water is obtained, rotate
the temperature control from ‘1’ to ‘10’ several
times to release any trapped air within the unit.
Once flushing out has been completed, stop the
water flow by turning the power selector to the
‘StOP’ position.
Fit the showerhead to the flexible hose and place
in the showerhead holder.
the shower is now ready for normal operation.
COMMISSIONING
COMMISSIONING
Fig.
T00324
Fig.
T00325
Fig.9
Fig.0
Содержание Shannon
Страница 24: ...Shannon electric shower 22 ...
Страница 25: ...Shannon electric shower 23 ...
Страница 26: ...Shannon electric shower 24 ...
Страница 27: ...Shannon electric shower 25 ...