4
C.) The basin floor should be properly pitched and
finished to prevent puddling.
D.) The cross members containing the anchoring studs
to receive the air cleaner base frame must be even
and level to provide a proper foundation for the
metal framework base.
Where the installation site is not suitable for a poured
concrete basin, rust resistant metal pans may be used.
The metal should withstand the weight of service
personnel in addition to the weight of the unit.
Each installation varies according to needs, but
normally the controller is located near the air cleaner.
Ideal mounting height is at eye level for ease in reading
the instrumentation and to facilitate service.
For ease in maintenance and component removal,
adequate space,
39” Minimum Required
, must be
provided in front of all access doors, motors, pump and
accessory equipment.
3. Outdoor
Installations
Requirements for outdoor protection vary in accordance
to climate and equipment component arrangement for
the particular job. The best approach, for equipment
protection, is the construction of a heated shed or
building over the installation. As an alternative, the
installing contractor should treat the equipment as
required to meet the specific needs.
Controller/PWM Power Supplies
As the controller/power supplies are designed for
remote mounting, they can be, in many cases, located
indoors and still be reasonably close to the main
cabinet. If located outdoors with the cabinet, it must be
weather protected.
Contact the local Trion Sales Office or the factory if
questions arise, or any additional information is
required.
SECTION II INSTALLATION
FOR THE INSTALLING CONTRACTOR
1. Unpack
and
Inspect
At the time the unit is received, all shipping containers
and their contents should be examined for damage. Any
damage occurring in shipment must be immediately
reported to the carrier, an inspection report completed
and a claim filed at the receiving point.
The number of shipping containers included in the
shipment is dependent upon the unit size and type.
When packaging the material for shipment,
consideration is given to grouping the components into
the installation categories in which they will be used.
The packing list included with shipment identifies the
various items to a specific box number. In general, the
grouping is as follows:
(A) Framework
(B) Ionizing-Collecting Cells
(C) Controller with Power Supplies
(D) Accessories
For the protection of the components, it is
recommended that those materials not immediately
needed for installation be stored in the container in
which they are received in a safe, dry and clean
location. This is particularly true with the ionizing-
collecting cells, which may be damaged when not
properly handled.
2. Assemble
Framework
The base frame, two sides and top are match marked
on the air entering side of the air cleaner at the factory
prior to shipment. See Figure 5.
(A) Position the base frame on the drain basin. Make
sure it is located with the marking “BOTTOM
FRONT” on the air entering side. The anchoring
studs in the drain basin should be located on the
inside of the frame channels and the entire frame
should be level. Shim as necessary.
(B) Secure the base as illustrated. It is important that
the studs do not protrude above the base frame
channel. Cut top of studs, if necessary. Each anchor
should be treated to prevent rust.
(C) Attach the side and top panels, match marking
where the pieces join on the air entering side; A to
A, B to B, etc. The required fasteners are packaged
and marked for the framework.
(D) After the outside frame structure is complete,
position and secure the intermediate cell supports.
The side to receive the air bypass strips marked
“FRONT” should be positioned toward the air
entering side.
3. Attach
Adjoining
Ductwork
Depending on the application, the installation plan may
or may not call for adjoining ductwork on the air entering
and/or air leaving sides of the cabinet.
When adjoining ducting is to be installed, attach to the
flanges on the air entering and air leaving sides of the
unit. Maintain structural squareness during attachment.
The seam should be made air and watertight by
caulking or gasketing.
The seam between the concrete drain basin and the
metal work must be caulked or grouted to form a good
watertight seal.
When a blower is installed downstream from the Trion
cabinet, the ducting between the cabinet and the blower
Содержание AIR BOSS 60 Series
Страница 11: ......
Страница 12: ......
Страница 13: ......
Страница 14: ......
Страница 15: ......
Страница 16: ......
Страница 17: ......
Страница 18: ......
Страница 19: ......
Страница 20: ......
Страница 21: ......
Страница 22: ......
Страница 23: ......
Страница 24: ......
Страница 27: ......
Страница 28: ......
Страница 29: ......