16.3 Production of sludge:
Important
The de-sludging of the Tricel Novo plant is the responsibility of the homeowner
De-sludging should never be carried out alone.
Do not allow equipment drive over the plant. Maintain a distance of at least 4 meters away from the covers
on the Tricel Novo wastewater treatment plant.
The access cover should never be left off an unattended plant
When the sludge is occupying 50% of the volume of the primary chamber de-sludging is required. This is
when the sludge is 700mm deep. Approximate de-sludging periods are shown in the table on page 8. The
Tricel Novo plant has a separate de-sludging access. De-sludging is done with a vacuum tanker (we
recommend the use of a licensed company).
16.3.1 De-sludging (emptying the solid waste from chamber 1 the primary chamber):
•
Remove the de-sludging access cover(s)
•
Empty the Tricel Novo plant using the vacuum tanker. Care must be taken not to damage the plant
with the hose of the vacuum tanker
•
Replace the de-sludging access cover securely
1. Operating conditions:
Disclaimer
We shall not be liable for any damage or loss, including consequential loss, caused by the failure of any
plumbing equipment or failure caused by the inclusion of prohibited material, in the plant.
The manufacturer’s installation, operation and maintenance instructions outlined in the technical manuals must
be followed at all times to ensure the plant operates as designed. Any variations to these guidelines could result
in the unit not performing to its full potential and the discharge may not meet the required standards. The
property owner has a legal responsibility to ensure that the plant does not cause pollution, a health hazard or
nuisance.
•
De-sludging is a critical part of the successful operation of the Tricel
Novo wastewater treatment plant
and is the responsibility of the customer. Only competent approved personnel should carry out de-
sludging. De-sludging must be carried out yearly, however the plant should by inspected regularly to
check the depth of sludge in the primary chamber. If de-sludging is required it should be done as soon as
possible.
Содержание NOVO EN6-50
Страница 1: ...Technical Installation Manual Tricel Wastewater treatment systems TTM T106 Rev 06 Nov 13...
Страница 10: ...10 1 Plant Drawings TricelNovo UK6 gravity plant Tricel Novo UK8 gravity plant Tricel Novo UK10 gravity plant...
Страница 11: ...11 Tricel Novo UK12 gravity plant Tricel Novo UK18 gravity plant...
Страница 12: ...12 Tricel NovoUK24 gravity plant Tricel NovoUK30 gravity plant Tricel Novo UK36 gravity plant 2 tank plant...
Страница 13: ...13 Tricel NovoUK42 gravity plant 2 tank plant...
Страница 14: ...14 Tricel Novo UK50 gravity plant 2 tank plant Example of stepped installation...
Страница 39: ...39...