An electrical connection to the plant must be maintained for it to function correctly. This ensures that the
plant has a continuous air supply and where necessary the discharge pump will operate.
•
The Tricel Novo plant is one part of the overall wastewater treatment system, which includes many
components (plumbing, ventilation, plant and polishing filter. Each component has to function correctly
for the overall system to work which is the responsibility of the homeowner.
•
If the plant is not installed correctly, flooding, overloading, electrical shock or floatation may occur. We
are not responsible for incorrectly installed plants.
•
Soak ways, drains and the emptying of primary chamber remains the responsibility of the client. Damage
to the installation due to the influx of surface water or the backing up of soak ways or drains is not
covered by the manufacturer.
•
To ensure the continuance of the plant performance the user has to take certain precautions including
the following:
The design loading of the plant should not be exceeded.
High volume discharges such, as those from swimming pools and Jacuzzi’s must never enter the
plant.
Surface water must not enter the plant.
Do not allow large quantities of chemicals to enter the plant including:
Water softener regenerate
Disinfectants
Strong Acids and Alkalis, or Photographic Chemicals
Oil or Grease
Petrol or diesel
Pesticides
Do not allow any of the following to enter the plant:
Large quantities of milk, alcohol or food
Large quantities of bleaches or cleaners
Baby wipes, cosmetic and cleaning wipes
Sanitary towels
Tampons
Kitchen paper
Nappies
Medication
•
Service personnel must be accommodated with clear access to the plant.
•
If others size the plant, we will supply to these specifications. In this case, the responsibility lies with
others in relation to the maximum flow/litres per day, the plant capacity and retention times. Similarly if
we size the plant and a greater load is placed on the plant by the addition of extra houses, bedrooms,
schools, crèche’s etc. or by other means we are not responsible for the plant in terms of overloading or
quality of effluent as the retention times may be compromised.
Содержание NOVO EN6-50
Страница 1: ...Technical Installation Manual Tricel Wastewater treatment systems TTM T106 Rev 06 Nov 13...
Страница 10: ...10 1 Plant Drawings TricelNovo UK6 gravity plant Tricel Novo UK8 gravity plant Tricel Novo UK10 gravity plant...
Страница 11: ...11 Tricel Novo UK12 gravity plant Tricel Novo UK18 gravity plant...
Страница 12: ...12 Tricel NovoUK24 gravity plant Tricel NovoUK30 gravity plant Tricel Novo UK36 gravity plant 2 tank plant...
Страница 13: ...13 Tricel NovoUK42 gravity plant 2 tank plant...
Страница 14: ...14 Tricel Novo UK50 gravity plant 2 tank plant Example of stepped installation...
Страница 39: ...39...