Ensure sufficient lifting height can be achieved and is available on site. If not a lifting bar as per option 2 is
required.
Option 1*
Option 2*
6.
Tanks which are greater than 4 modules (4.6m) in length should be lifted using the slings provided as per
option 3, shown below.
Option 3*
Ensure sufficient lifting height can be achieved and is available on site. If not a lifting bar as per option 4 is
required.
Option 4*
Ensure the slings are positioned at a joint on the tank, firmly secured and the load is evenly balanced.
*Typical lifting examples
Содержание NOVO EN6-50
Страница 1: ...Technical Installation Manual Tricel Wastewater treatment systems TTM T106 Rev 06 Nov 13...
Страница 10: ...10 1 Plant Drawings TricelNovo UK6 gravity plant Tricel Novo UK8 gravity plant Tricel Novo UK10 gravity plant...
Страница 11: ...11 Tricel Novo UK12 gravity plant Tricel Novo UK18 gravity plant...
Страница 12: ...12 Tricel NovoUK24 gravity plant Tricel NovoUK30 gravity plant Tricel Novo UK36 gravity plant 2 tank plant...
Страница 13: ...13 Tricel NovoUK42 gravity plant 2 tank plant...
Страница 14: ...14 Tricel Novo UK50 gravity plant 2 tank plant Example of stepped installation...
Страница 39: ...39...