Lift tank into position and align height for connecting pipe work.
Ensure correct inlet and outlet orientations of the plant, which may
contain 1 or more tanks.
Ensure that each tank is 100% level.
Connect pipe work, as required.
Ballast the tank with water.
Refer to detailed installation
Commence gravel backfilling in 300mm layers approximately up to
50mm over the cylindrical body of the tank, ensuring tank and any pipe
work is properly supported.
Commence concrete backfilling in 300mm layers approximately up to
the pipe work level, ensuring tank and any pipe work is properly
supported.
Continue backfilling with gravel up to 50mm over the cylindrical body
of the tank
Mount and seal any turret extensions.
Complete backfilling with topsoil up to the max ground level line
indicated on the plant. The surrounding finished ground level should
never be higher than the “max ground level line”.
Compact evenly around the tanks to ensure it’s is properly supported.
An access chamber should be installed before and after the tank for
sampling and to assist in clearing possible blockages
If sewage consists of high quantities of grease a grease trap should be
installed prior to the plant.
Note:
The option of a reinforced concrete slabs or deadman anchor may also be used on wet sites. This
should be designed by an on-site structural engineer to suit site conditions.
Содержание NOVO EN6-50
Страница 1: ...Technical Installation Manual Tricel Wastewater treatment systems TTM T106 Rev 06 Nov 13...
Страница 10: ...10 1 Plant Drawings TricelNovo UK6 gravity plant Tricel Novo UK8 gravity plant Tricel Novo UK10 gravity plant...
Страница 11: ...11 Tricel Novo UK12 gravity plant Tricel Novo UK18 gravity plant...
Страница 12: ...12 Tricel NovoUK24 gravity plant Tricel NovoUK30 gravity plant Tricel Novo UK36 gravity plant 2 tank plant...
Страница 13: ...13 Tricel NovoUK42 gravity plant 2 tank plant...
Страница 14: ...14 Tricel Novo UK50 gravity plant 2 tank plant Example of stepped installation...
Страница 39: ...39...