Start-Up Procedures
29
• Final Check: Condensate drain installation
-
Have you installed a condensate drain line from
the water heater to a drain or laundry tub?
• Final check: Setting the DIP switches
-
Are all DIP switches correctly set on the main
board?
• Final check : Connecting the power supply
-
Is the AC 120V power correct ?
-
Have you checked the polarity of the electrical
connection?
• Final check : Pressure relief valve
-
Have you installed an approved pressure relief
valve on the water heater?
-
Is the pressure relief valve at least 3/4˝ in diam-
eter?
-
Have you installed the pressure relief valve on
the hot water outlet pipe near the Water Heater?
• Final check : Burner flames
-
The burner flame must be checked periodically
for a constant proper blue color.
-
If the flame does not appear normal, the burner
may need to be cleaned.
-
If the burner needs to be cleaned, it must be per-
formed by a qualified service technician.
Sight Glass
Blue flame picture
Marquis Manual_61515_Water Heater 7/1/15 1:58 PM Page 32
Содержание Marquis TWH180
Страница 26: ...23 Control System Marquis Manual_61515_Water Heater 7 1 15 1 58 PM Page 26 ...
Страница 27: ...24 Control System Ladder Diagram Marquis Manual_61515_Water Heater 7 1 15 1 58 PM Page 27 ...
Страница 34: ...31 Repair Parts Diagram Marquis Manual_61515_Water Heater 7 1 15 1 58 PM Page 34 ...
Страница 36: ...33 Repair Parts Diagram Marquis Manual_61515_Water Heater 7 1 15 1 58 PM Page 36 ...
Страница 37: ...34 Repair Parts Diagram 4 Marquis Manual_61515_Water Heater 7 1 15 1 58 PM Page 37 ...