HEALTH AND SAFETY 

 

INFORMATION FOR THE USER, INSTALLER AND SERVICE ENGINEER 

 

 

Under  the  Consumer  Protection  Act  1987  and  the  Health  and  Safety  at  Work  Act  1974,  it  is  a 
requirement to provide information on substances hazardous to health (COSHH Regulations 1998). 
 
TR Engineering takes every reasonable care to ensure that its products are designed and constructed to 
meet  these  safety  requirements  when  the  products  are  properly  installed  and  used.  To  fulfil  the 
requirements, products are comprehensively tested and examined before despatch. 
 
When  working  on  the  appliance,  it  is  the  responsibility  of  the  user  or  engineer  to  ensure  that  personal 
protective  clothing  or  equipment  appropriate  to  parts  that  could  be  considered  hazardous  or  harmful  is 
worn. 
 
This appliance may contain some of the items below:

 

 
Insulation and Seals 
 

Glass rope, mineral wool, insulation pads, ceramic fibre and glass insulation. 
 
When handling, avoid inhalation and contact with eyes. These may be harmful and cause irritation to the 
skin, eyes, nose or throat. Use disposable gloves, facemasks and eye protection. 
 
After handling, wash hands and other exposed areas. When disposing of materials, limit dust and the risk 
of inhalation by using a water spray. Ensure materials are securely wrapped. 
 
Seek  urgent  medical  attention  if  inhaled  or  ingested.  Exposure  to  eyes  and  skin  should  be  followed  by 
immediate cleansing of the affected areas and medical attention if necessary. 
 

Glues, Sealants and Paints 
 

The  glues,  sealants  and  paints  used  present  no  known  hazards  when  the  appliance  is  used  in  the 
manner for which it is intended. 
 

Mineral Oils 

 
The appliance is designed to run on 28 sec. Kerosene class C2. The effects of mineral oils on  the skin 
will vary depending on the length of exposure. 
 
Avoid  any  skin  contact  with  oil  or  clothing  contaminated  with  oil.  Kerosene  will  remove  the  protective 
grease normally present on the surface of the skin, rendering it dry, liable to cracking and more prone to 
damage caused by cuts and abrasions. Seek immediate medical attention for any rash, wart or sore that 
develops on any part of the body. 
 
Barrier  cream  that  contains  lanolin,  such  as  Rosalex  Antisolv  is  recommended  together  with  a  strict 
regime of personal cleaning. 
 
Do  not  breathe  oil  vapours.  Do  not  fire  the  burner  in  the  open  (i.e.  out  of  the  boiler),  as  a  misfire  will 
produce unburned oil vapours. Under no circumstances should mineral oils be taken internally. 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

Содержание EuroStar Band A

Страница 1: ...29 36kW For Balanced or Conventional Flue OPERATION INSTALLATION COMMISSIONING SERVICING INSTRUCTIONS Please read these instructions carefully before installing commissioning and using this appliance...

Страница 2: ...other exposed areas When disposing of materials limit dust and the risk of inhalation by using a water spray Ensure materials are securely wrapped Seek urgent medical attention if inhaled or ingested...

Страница 3: ...cations 9 Installation 10 Regulations Health Safety 10 Siting 10 Ventilation 10 11 System design 12 Electrical supply wiring diagram 12 Condensing system 13 Oil 14 Storage protection 14 Supply 14 15 F...

Страница 4: ...ntrol thermostat fig 1 allows selection of water temperatures at five positions between 55 C and 82 C Where a cylinder thermostat is also fitted to the system ensure that the boiler thermostat is set...

Страница 5: ...pe adversely affecting the operation of the burner and potentially reducing the life expectancy of the oil pump After an oil delivery allow half an hour for the oil to settle in the tank before using...

Страница 6: ...arty will not be accepted unless authorised in advance by TR Engineering Ltd Technical Assistance A team of trained technical advisors is available to discuss any problem with the appliance In many ca...

Страница 7: ...TR Engineering balanced flue kit it becomes a room sealed appliance These kits allow the boiler to be installed in a wide variety of site conditions The balanced flue is available in horizontal high...

Страница 8: ...FIG 3 FIG 4 15 26 29 36 A 460 460 B 854 895 C 597 672 D 355 404 E 603 660 F 693 761 G 743 821 H 16 16 J 60 60 K 37 37 L 197 198 M 85 85 N 71 71 P 231 231...

Страница 9: ...22mm compression Conventional Flue Socket 4 100mm Maximum Operating Pressure 3 bar 43 5 psi Test Pressure 4 5 bar 65 3 psi Starting Current 3 5 amp Running Current 0 77 amp Control Thermostat Adjusta...

Страница 10: ...le base that is capable of supporting the installed weight of the boiler including its water content Sound levels While the low sound level of the boiler makes it suitable for utility room or kitchen...

Страница 11: ...FIG 5 Conventional Flue FIG 6 Balanced Flue...

Страница 12: ...etween 20 C and 30 C Electrical supply All electrical wiring must be carried out by a qualified electrician in accordance with current IEE Regulations and any local regulations that apply The boiler m...

Страница 13: ...rom the boiler on a minimum fall of 1 20 fig 9 Insulate any external pipework to prevent the condensate from freezing DO NOT use copper pipework for the condensate drain If the boiler is installed bel...

Страница 14: ...of a leak The tank capacity exceeds 2 500 litres Supply A long life flexible oil hose is supplied with the boiler A filter and shut off valve are also required These should be fitted in the positions...

Страница 15: ...0 0 5 1 0 1 5 2 0 3 0 3 5 8mm ID Supply Maximum Run Metres 35 30 25 20 15 8 6 10mm ID Supply 100 100 100 90 70 30 20 FIG 10 Lift H 0 5 1 0 1 5 2 0 8mm ID Supply Maximum Run Metres 10 20 40 60 10mm ID...

Страница 16: ...ffected by high wind conditions as the wind pressures are applied equally to both the air intake and flue gas discharge sections creating the balanced condition Balanced flue condensing boilers are al...

Страница 17: ...rnal corner 300 600 N From a vertical structure to one side 750 G Above ground or balcony level 300 600 O Above a vertical structure less than 750mm to one side 600 Scotland P From a ridge terminal to...

Страница 18: ...e heat exchanger and secure in position using the four nuts previously removed Adjust the terminal length as required ensuring a minimum distance of 140mm is kept from the end of the terminal to the e...

Страница 19: ...Model Dim A 15 20 746mm 20 26 746mm 29 36 794mm Model Dim A 15 20 746mm 20 26 746mm 29 36 794mm 2334 600mm Horizontal Balanced Flue Kit 2335 1000mm Horizontal Balanced Flue Kit FIG 17 FIG 18...

Страница 20: ...suring a minimum distance of 140mm is kept from the end of the terminal to the external face of the wall Seal the outer horizontal sections together with a suitable material See figs 21 22 for allowab...

Страница 21: ...ion 222820 1 5 Spigot Sealing Plate 222825 1 6 Spigot 222819 1 7 Sealing Plate Gasket 223198 1 8 Flue Sealing Plate 223191 1 9 O Ring Seal 221647 2 Item Description Part No Kit 2355 Part No Kit 2356 Q...

Страница 22: ...600mm Horizontal Balanced Flue kit Model A B 15 20 1892 1038 20 26 1892 1038 29 36 1940 1046 2357 High Level Adaptor Kit used with 2356 1000mm Horizontal Balanced Flue Kit Model A B 15 20 1892 1038 20...

Страница 23: ...us sections in the same manner Note Both instances of item 7 can be discarded if they are not required Of the main flue lengths only 6 8 are mandatory Fit the terminal extension 9 over the preceding f...

Страница 24: ...Spigot Sealing Plate 222825 1 5 O Ring Seal 221647 6 6 Flue Lower Section 222820 1 7 Flue Middle Section 222829 2 8 Flue Top Section 222877 1 9 Terminal Lower Section 222880 1 10 Terminal 222850 1 11...

Страница 25: ...ed sections Longer runs can be achieved by purchasing additional sections of pipe Permanent obstructions may be avoided by the use of 45 elbows See page 26 for details A B C Min Max 15 20 4600 1390 37...

Страница 26: ...0mm each to the calculation The 90 bend in the vertical balanced flue kit contributes 1000mm The 45 elbows can be used to offset the vertical sections of flue on both the high level and vertical flue...

Страница 27: ...e oil and electrical supplies If the boiler is not going to be run during freezing conditions the system should be drained of water Handing over After completing the boiler installation the engineer s...

Страница 28: ...er emerges from the drainage pipe Replace the baffle strips ensuring each is firmly pushed into the flue ways See figs 28 29 Burner and combustion chamber Ensure the electrical supply is switched off...

Страница 29: ...below The use of a tool may be required to lift the third baffle 3 from the combustion chamber Insert a screwdriver or similar into the lifting hole in the centre of the baffle and raise above the li...

Страница 30: ...will result in incorrect combustion and may Invalidate the appliance warranty Secondary Baffles Correct placement of the secondary baffles is crucial to the boiler s efficient operation Turn the baffl...

Страница 31: ...ulty photocell or photocell not seeing flame Clean photocell check for damage ensure it is fully inserted replace as necessary Low oil pressure Check pump pressure and adjust Morning start lock out Fa...

Страница 32: ...FIG 30 Burner Fault Finding Logic Chart...

Страница 33: ...ottom baffle 1 224608 1 224729 1 16 Condensing unit spiral baffle 1 224589 18 224589 13 16 Condensing unit blade baffle 1 224735 5 17 Combustion chamber access cover 224670 1 224690 1 18 Access cover...

Страница 34: ...FIG 31 Boiler Assembly...

Страница 35: ...The following information should be provided upon installation of the appliance for householder reference Installation Engineer Company Company Address Company Tel No...

Страница 36: ...strations contained within are vested in TR Engineering Ltd And neither the brochure or any part thereof may be reproduced without prior written consent TR Engineering s policy is one of continuous re...

Отзывы: