![Tri-Clover Tri-Flo CL Series Скачать руководство пользователя страница 19](http://html.mh-extra.com/html/tri-clover/tri-flo-cl-series/tri-flo-cl-series_service-and-installation-manual_1159609019.webp)
- 19 -
3.
Install front gasket (11), stationary seal (12), rear gasket (11) and seal gland (10) into
casing (1) using Allen screws (9) and washers (38). Torque the screws to 72 lb-in (8
Nm). For the CL4311 and the CL6410, torque the screws to 60 lb-in (7 Nm). NOTE: A
rear elastomer gasket is required when using a front PTFE gasket.
4.
Install two screws (23) securing stuffing box (22) to casing.
5.
Install pin (19) into stainless steel drive collar (18) as required.
6.
Install o-ring (5) into stainless steel drive collar (18).
7.
Install o-ring (5) into rotating seal (15).
8.
Install spring (16) onto rotating seal (15) and onto stainless steel drive collar (18).
MAINTENANCE
38
9
20
22
10
11
12
11
1
23
Torque screws to 72 lb-in (8 Nm).
For the CL4311 and 6410, torque screws to 60 lb-in (7 Nm).
Содержание Tri-Flo CL Series
Страница 1: ...Tri Flo CL Series Centrifugal Pumps Service Installation Manual CLSM 98a ...
Страница 31: ... 31 PARTS LIST See back page for cross sectional drawing ...
Страница 41: ......