
© Copyright 2020 TRENDnet. All Rights Reserved.
TRE
NDnet User’s Guid
e
TPE-3012LS / TPE-3018LS
61
4. Under the PoE Schedule Edit section, check the
Schedule Status
option to enable PoE
scheduling. Click the
Name
drop-down list to select the schedule you created and check
the PoE port or ports you would like to assign the schedule.
4. Click
Apply
.
5. In the top right, click
Save
to save the configuration settings to NV-RAM/startup
configuration.
6. Click
OK
.
PD Alive Check
PoE > PD Alive Check
This section allows you to configure a ping to a specific PoE device on a specific PoE port
and if the ping becomes unresponsive the switch will automatically disable and re-
enable the PoE port in an attempt to automatically recover the PoE device (PD powered
device).
1. Log into your switch
management page (see “
Access your switch management page
on page 11).
2. Click on
PoE
and click on
PD Alive Check.
3. Check the PoE port with the PoE device connected to you would like to configure for
PD alive check and click
Edit
.
4. Check the
Enable
option for Status to enable PD alive check on the selected port.
Enter the IP Address for the PoE device under the
ping PD IP Address
(ex:
192.168.10.107)
Review the additional settings below.
•
Interval Time
–
Enter the time in seconds each time the switch will check for a
ping response from the PoE device. (Range: 10
–
300)
•
Retry Count
–
In the case that a ping response fails, enter the number of times
the switch will retry for a ping response before disabling and re-enabling the
PoE port. (Range: 1-5)
•
Action
–
An option must be selected for PD alive check to function.
o
None
–
If the ping response fails according to the time parameters set,
no action will be taken.
o
PD Reboot
–
If the ping response fails according to the time
parameters set, the switch will disable and re-enable the PoE port
attempting to automatically recover the connected PoE device.
Содержание TPE-3012LS
Страница 1: ...TRENDnet User s Guide Cover Page...
Страница 187: ......