
© Copyright 2020 TRENDnet. All Rights Reserved.
TRE
NDnet User’s Guid
e
TPE-3012LS / TPE-3018LS
18
Scheduling
Under the
Schedule Status
setting, click the drop-down list and
Enable
to enable PoE
Scheduling.
Item
Description
Nominal Power
Maximum supply power.
Consuming Power
Current consumed power.
Remaining Power
Remaining a
vailable power.
Schedule Status
Schedule status global
switch.
Name
PoE
Schedule Name.
Port List
The ports provide power in designated schedule index.
Schedule Status
The current schedule status.
Select an entry to to configure PoE port scheduling and click
Edit
.
Item
Description
Index
The serial number of schedule list.
Schedule Status
Schedule Status
•
Checked:
Schedule status
is enabled.
•
Unchecked:
Schedule status
is disabled.
Name
Enter the PoE schedule name.
Port List
Select the port
provide power.
4. After completing your configuration changes, click
Apply
.
5. Click
Save
in the top left menu to save configuration to NV-RAM.
Содержание TPE-3012LS
Страница 1: ...TRENDnet User s Guide Cover Page...
Страница 187: ......